INTIEANorway · The Planning and Buildings Act (2016-)PolicyIn force

The Planning and Buildings Act (2016-)

Energy requirements in the technical requirements for building works chapter 14, Technical Building Works Regulations. Latest amendments adopted November 12, 2015.  The latest tightening of the energy efficiency requirements for new buildings was adopted November 2015, entered…

Last changed 2 years ago.

Extracted view for reading · Original for compliance evidence

Lifecycle

  1. Effective
  2. Last change

Country / jurisdiction: Norway · Year: 2016 · Status: In force · Level: National · Type: Voluntary

Energy requirements in the technical requirements for building works chapter 14, Technical Building Works Regulations. Latest amendments adopted November 12, 2015.

The latest tightening of the energy efficiency requirements for new buildings was adopted November 2015, entered into force 1. January 2016, with a transition period until 1. January 2017.

Detailed title: Amendments to the technical requirements for building works chapter 14 (Energy), Technical Building Works Regulations of 26 March 2010 No. 489. Planning and Building Act of 27 June 2008 no 71.

https://lovdata.no/dokument/LTI/forskrift/2015-11-12-1290 (amending regulation, in Norwegian)https://lovdata.no/dokument/SF/forskrift/2010-03-26-489 (regulation, in Norwegian)

Applicable Building Type(s)

Existing non-residential, Existing residential, New non-residential, New residential

Policy Requirement Level

Mandatory

Policy Sequence

Policy preceded by: The Planning and Building Act (2010-2015)

Governance

Development Authority: Norwegian Building Authority, Ministry of Local Government and Modernisation

Implementation Authority: Local Government (municipalities)

Verification Authority: Local Government (municipalities)

Enforcement Authority: Local Government (municipalities)

Prescriptive Compliance path

Prescriptive - Energy Requirements for Buildings

Heated usable floor area

Energy Requirements:

Insulation

U-Values (W/m2.K)

Walls

Floor

Roof

Minimum requirements

‰¤ 0.22

‰¤ 0.18

‰¤ 0.18

Basic/standard requirements

‰¤ 0.18

‰¤ 0.10

‰¤ 0.13

Windows

U-Values (W/m2.K)

Windows

Minimum requirements

‰¤ 1.2

Basic/standard requirements

‰¤ 0.8

Proportion of window and door areas ‰¤ 25% of heated usable floor space.

Air Leakage

The energy budget in the requirements assume an air leakage of max. 0.6 l/(s.m2) at 50 Pa.

Renewable Energy

Section 14-4 Energy supply requirements

1) The installation of fossil fuel heating installations is not permitted.

2) Buildings with heated usable floor space (BRA) of more than 1,000 m2 shall

a) have energy flexible heating systems,

b) adapted for the use of low temperature heating systems.

3) The requirements in the second paragraph does not apply to small houses.

4) Small houses must be constructed with chimneys. The requirement does not apply if

a) the house is constructed with a central heating system, or

b) yearly net energy need for heating does not exceed the requirements for passive houses, calculated in accordance with Norwegian standard NS 3700:2013 Criterias for passive houses and low energy houses.

Compliance Softwares:

Various software can be used if in line with national calculation methods

End-uses considered:

Space heating, Appliances, Water heating, Lighting interior, Ventilation

Resources

Notes

Climate zones

Official source: https://lovdata.no/dokument/LTI/forskrift/2015-11-12-1290

Source

https://www.iea.org/policies/2537

Canonical document at the regulator. Always cite this URL — not the Vantage detail page — in compliance evidence.

Related in International

INTIEACanada · National Energy Code of Canada for BuildingsPolicyIn force

National Energy Code of Canada for Buildings

The National Energy Code of Canada for Buildings (NECB) 2025 is a national model code that sets technical requirements that address the protection of the environment in the design and construction of new buildings and in subsequent alterations. The 2025 edition was published in…

10 days agoeff.
INTIEACanada · Deep Retrofit Accelerator InitiativePolicyIn force

Deep Retrofit Accelerator Initiative

Launched by Natural Resource Canada in February 2023, the Deep Retrofit Accelerator Initiative (DRAI) provides funding to organisations and projects that facilitate the development of deep retrofits in commercial, institutional, and mid- or high-rise multi-unit residential…

10 days agoeff.
INTIEASweden · Tax exemption for pure and highblend biofuelsPolicyIn force

Tax exemption for pure and highblend biofuels

The Swedish scheme to promote the use of sustainable biofuels in transport has been prolongated until 31 December 2032 with an estimated budget of 1.3 USD billion (SEK 14.2 billion).    The scheme was originally approved by the Commission in November 2003 and prolonged several…

10 days agoeff.
INTIEACanada · Codes Acceleration Fund (CAF)PolicyIn force

Codes Acceleration Fund (CAF)

Launched by Natural Resource Canada in 2023,  the Codes Acceleration Fund (CAF) provides funding to support efforts to accelerate and contribute to code (or regulation) adoption, compliance and enforcement. The programme provides funding to:   • provinces, territories,…

10 days agoeff.
INTIEACanada · Energy Efficiency Regulations, 2016 - Electric motorsPolicyIn force

Energy Efficiency Regulations, 2016 - Electric motors

The Energy Efficiency Regulations set standards for several industrial products and industrial applications of products including motors, air compressors, pumps, dry-type transformers and ceiling fans.     The standards for electric motors were regularly updated, lastly in 2022…

10 days agoeff.