Lifecycle
- Effective
- Last change
Country / jurisdiction: Spain · Year: 2020 · Status: In force · Level: National · Type: Voluntary
The Technical Building Code (CTE) sets energy efficiency targets for buildings, which vary depending on the building's use and location. New residential buildings in warm climates must meet a max energy consumption limit of 30 kWh/m2 per year, while non-residential buildings must meet a limit of 50 kWh/m2 per year. It also includes requirements for space heating, space cooling, water heating, ventilation, humidity control and lighting, and a minimum contribution of thermal renewable energy sources.
Official source: https://www.codigotecnico.org/DocumentosCTE/AhorroEnergia.html
Source
https://www.iea.org/policies/19563Canonical document at the regulator. Always cite this URL — not the Vantage detail page — in compliance evidence.