Lifecycle
- Effective
- Last change
Country / jurisdiction: Uzbekistan · Year: 2019 · Status: In force · Level: National · Type: Voluntary
Manufacturers, including those who have installed generating electrical installations in private residential buildings, have the right to connect to the unified electric power system in the manner prescribed by this Regulation.
To connect their electrical installations to the unified electric power system, the manufacturer is obliged to obtain technical specifications for the connection of new or additional generating capacities from the organization to which the connection is supposed to be made.
When announcing a tender by the Ministry of Energy of the Republic of Uzbekistan or other authorized state body for attracting investors for the construction of electric power facilities for the production of electric energy, the following must be attached to the tender documentation: information about the location, type and available capacity of the enterprise for the production of electrical energy, as well as its other main parameters.
In accordance with the technical specifications, at the request of the manufacturer, a specialized design organization is developing a project for connecting the manufacturer's electrical installations to a single electric power system.
Official source: https://lex.uz/docs/443230
Source
https://www.iea.org/policies/13312Canonical document at the regulator. Always cite this URL — not the Vantage detail page — in compliance evidence.