INTIEASpain · Renewable Energy AuctionPolicyIn force

Renewable Energy Auction

The Ministry for the Ecological Transition and the Demographic Challenge (MITECO) has approved the first resolution to call for renewable energy auctions with the new remuneration framework. The regulatory process is completed to offer a stable framework that attracts investment…

Last changed 4 years ago.

Extracted view for reading · Original for compliance evidence

Lifecycle

  1. Effective
  2. Last change

Country / jurisdiction: Spain · Year: 2020 · Status: In force · Level: National · Type: Voluntary

The Ministry for the Ecological Transition and the Demographic Challenge (MITECO) has approved the first resolution to call for renewable energy auctions with the new remuneration framework. The regulatory process is completed to offer a stable framework that attracts investment and encourages economic activity throughout the country's renewable energy value chain in a recovery scenario after the health crisis, while allowing consumers to benefit directly from the reductions in the generation costs of these technologies.

The Spanish government has awarded a total of 3034 MW of wind and solar power capacity in the first renewable energy auction held since July 2017. A total of 2036 MW was awarded to solar photovoltaic PV projects, while bidders on wind benefitted with 998 MW. As a result of the first tender 26 Jan. 2021, a total of 3034 MW has been assigned, distributed among 32 agents, of which 2036 MW correspond to photovoltaic technology and 998 MW to wind technology. The auction resulted in a weighted average price of 24.47 EUR/MWh for PV technology and 25.31 EUR/MWh for wind power, an average of 43% lower than the long-term.

MITECO has convened to open a new auction in October 2021, for 3,300 MW of wind and solar photovoltaic capacity, of which 600 MW should be in operation by September 2022, and the rest commissioned before the end of June 2024. Additionally, 300 MW will be assigned for small PV installations. Another auction is also planned in 2021 for at least 200 MW of solar thermal, 140 MW of biomass and 20 MW of other technologies.

Official source: https://www.miteco.gob.es/en/prensa/ultimas-noticias/el-gobierno-convoca-la-primera-subasta-de-energ%C3%ADa-renovable-con-el-nuevo-marco-retributivo/tcm:38-518625

Source

https://www.iea.org/policies/12709

Canonical document at the regulator. Always cite this URL — not the Vantage detail page — in compliance evidence.

Related in International

INTIEACanada · National Energy Code of Canada for BuildingsPolicyIn force

National Energy Code of Canada for Buildings

The National Energy Code of Canada for Buildings (NECB) 2025 is a national model code that sets technical requirements that address the protection of the environment in the design and construction of new buildings and in subsequent alterations. The 2025 edition was published in…

10 days agoeff.
INTIEACanada · Deep Retrofit Accelerator InitiativePolicyIn force

Deep Retrofit Accelerator Initiative

Launched by Natural Resource Canada in February 2023, the Deep Retrofit Accelerator Initiative (DRAI) provides funding to organisations and projects that facilitate the development of deep retrofits in commercial, institutional, and mid- or high-rise multi-unit residential…

10 days agoeff.
INTIEASweden · Tax exemption for pure and highblend biofuelsPolicyIn force

Tax exemption for pure and highblend biofuels

The Swedish scheme to promote the use of sustainable biofuels in transport has been prolongated until 31 December 2032 with an estimated budget of 1.3 USD billion (SEK 14.2 billion).    The scheme was originally approved by the Commission in November 2003 and prolonged several…

10 days agoeff.
INTIEACanada · Codes Acceleration Fund (CAF)PolicyIn force

Codes Acceleration Fund (CAF)

Launched by Natural Resource Canada in 2023,  the Codes Acceleration Fund (CAF) provides funding to support efforts to accelerate and contribute to code (or regulation) adoption, compliance and enforcement. The programme provides funding to:   • provinces, territories,…

10 days agoeff.
INTIEACanada · Energy Efficiency Regulations, 2016 - Electric motorsPolicyIn force

Energy Efficiency Regulations, 2016 - Electric motors

The Energy Efficiency Regulations set standards for several industrial products and industrial applications of products including motors, air compressors, pumps, dry-type transformers and ceiling fans.     The standards for electric motors were regularly updated, lastly in 2022…

10 days agoeff.