Global regulations corpus

Browse 15,090 regulations from 36 regulators

2,998 updated in the last 30 days. Public corpus — no signup required to read.

Showing 151–200 of 946 regulations

INTIEAMalaysia · Rural Electricity Supply Programme (BELB)PolicyIn force

Rural Electricity Supply Programme (BELB)

The Rural Electricity Supply Programme, under the responsibility of Ministry of Rural and Regional Development, aims at developing electricity access in rural areas of

4 months agoeff.
INTIEAMalaysia · Large Scale Solar Photovoltaic (LSSPV) ProgrammePolicyIn force

Large Scale Solar Photovoltaic (LSSPV) Programme

The  Large Scale Solar Photovoltaic (LSSPV) Programme is a government-led competitive bidding scheme to allow plant owners to generate solar

4 months agoeff.
INTIEAMalaysia · Environmental Quality (Clean Air) Regulations 2014PolicyIn force

Environmental Quality (Clean Air) Regulations 2014

The Environmental Quality (Clean Air) Regulations 2014 sets emissions limits and technical standards for stationary installations, including power plants, for solid, liquid and gaseous

4 months agoeff.
INTIEAThailand · Thai Feed-in Tariff (FiT) PolicyPolicyIn force

Thai Feed-in Tariff (FiT) Policy

In 2022, the Energy Regulatory Commission (ERC) of Thailand released the most recent guidelines governing the expansion of feed-in tariffs until 2030. These regulations endorse the implementation of SPP Hybrid Firm and VSPP Semi-Firm programs, setting targets of 200 MW and 269…

4 months agoeff.
INTIEAThailand · Draft Ministerial Regulation on Excise Tax Rates - carbon pricing on petroleum productsPolicyIn force

Draft Ministerial Regulation on Excise Tax Rates - carbon pricing on petroleum products

The government of Thailand introduced a carbon tax of THB 200/t on petroleum products on January 21,

4 months agoeff.
INTIEAViet Nam · National Power Development Planning VIII (2021 - 2030)PolicyIn force

National Power Development Planning VIII (2021 - 2030)

The National Power Development Plan VIII (PDP8) for the 2021-2030 period, with a vision to 2050, sets out Vietnam’s strategy to transition its power system toward cleaner energy sources while ensuring energy security and meeting growing electricity demand. The plan aims to…

4 months agoeff.
INTIEASingapore · Carbon Pricing ActPolicyIn force

Carbon Pricing Act

Singapore’s Carbon Pricing Act, implemented on 1 January 2019, establishes a carbon tax on facilities emitting 25 ktCO₂e or more annually, covering power generation and large industrial sources. The tax was initially set at SGD 5/tCO₂e for 2019-2023 and was increased to SGD…

4 months agoeff.
INTIEASerbia · Law 109/2025 on greenhouse gas emissions taxPolicyIn force

Law 109/2025 on greenhouse gas emissions tax

Serbia introduced taxes on greenhouse gas emissions (CO2, N2O and PFCs) starting from January 2026. The tax cover the production of electricity, cement, aluminium, artificial fertilizers and nitrogen compounds and crude iron, steel, and ferroalloys. The tax rate is set at four…

4 months agoeff.
INTIEASaudi Arabia · Saudi National Renewable Energy Program (NREP)PolicyIn force

Saudi National Renewable Energy Program (NREP)

National Renewable Energy Program (NREP) supported by PIF. It involves 11.8 GW planned with Acwa Power by 2025 (pending approval by the Ministry of Energy) and falls within the objective to have 50% of electricity generated by renewables by 2030, the rest coming from natural

5 months agoeff.
INTIEAKenya · Kenya Power Investment Plan - transmission linesPolicyIn force

Kenya Power Investment Plan - transmission lines

Kenya Power announced a KES 889 million investment in transmission lines in Western

5 months agoeff.
INTIEAMexico · 2024 Investment Programs and Projects (PPI) related to the energy sectorPolicyIn force

2024 Investment Programs and Projects (PPI) related to the energy sector

The Mexican government is allocating specific spending for the construction of strategic sector infrastructures, including electricity generation, transmission, energy access, and energy

5 months agoeff.
INTIEAMexico · 2024 Investment Programs and Projects (PPI) - Low-carbon electricityPolicyIn force

2024 Investment Programs and Projects (PPI) - Low-carbon electricity

In the framework of its Investment Programs and Projects (IPP), the Mexican government is allocating specific funding for developing low-carbon electricity

5 months agoeff.
INTIEAMexico · 2024 Investment Programs and Projects (PPI) - NuclearPolicyIn force

2024 Investment Programs and Projects (PPI) - Nuclear

In the framework of its Investment Programs and Projects (IPP), the Mexican government is allocating specific funding for modernising nuclear power

5 months agoeff.
INTIEAKenya · Environmental Management and Coordination (Air Quality) RegulationsPolicyIn force

Environmental Management and Coordination (Air Quality) Regulations

The Regulations sets framework and emissions limits for air pollutants from stationary and mobile

5 months agoeff.
INTIEASerbia · Law on the Use of Renewable Energy SourcesPolicyIn force

Law on the Use of Renewable Energy Sources

This law establishes a legal framework to to increase the use of energy from non-fossil sources, it sets market premiums and reserved feed-in tariffs for small plants (less than 500 kW, or 3 MW for wind) and demonstration projects

5 months agoeff.
INTIEACote D'ivoire · Eastern backbone projectPolicyIn force

Eastern backbone project

The Eastern backbone project includes the construction of a 541 km long electricity transmission line in the East of Cote

5 months agoeff.
INTIEAUnited Arab Emirates · Council of ministries Decree No.12 for 2006: Air Pollution ProtectionPolicyIn force

Council of ministries Decree No.12 for 2006: Air Pollution Protection

This decree sets regulations and guidelines to preserve air quality. It defines emissions standards for cars and stationary sources. Article 4 states that facilities (including oil and gas facilities) should comply with the emissions limit outlined in Annex 2, where the value…

5 months agoeff.
INTIEAMorocco · Decree 2-09-631 setting limit values ​​for the release, emission or discharge of pollutantsPolicyIn force

Decree 2-09-631 setting limit values ​​for the release, emission or discharge of pollutants

The Decree sets emissions limits for stationary installations over dust and gaseous

5 months agoeff.
INTIEAEgypt · Investment in the electricity sector and renewablesPolicyIn force

Investment in the electricity sector and renewables

The Ministry of Planning, Economic Development and International Cooperation budgets in the 2025/2026 plan investments of USD 3 billion (EGP 136.3 billion) in the electricity and renewable energy

5 months agoeff.
INTIEAUzbekistan · Solar Home programmePolicyIn force

Solar Home programme

Under the Solar Home programme, households can receive a direct subsidy of up to 1,000 soums for each kilowatt-hour of electricity generated by solar

5 months agoeff.
INTIEAUzbekistan · Order 3586 on the inventory of atmospheric air pollution and their standardisationPolicyIn force

Order 3586 on the inventory of atmospheric air pollution and their standardisation

The Order sets a detailed manual to inventory air pollutants from stationary installations, along with emissions limits depending on the fuel and climate

5 months agoeff.
INTIEAKazakhstan · Technical specific emission standards including for mobile sources of pollutant emissions into the atmospherePolicyIn force

Technical specific emission standards including for mobile sources of pollutant emissions into the atmosphere

The Standard provides air pollutant limits for stationary installations, including power generation

5 months agoeff.
INTIEAKazakhstan · Modernization of Energy and Communal Sectors (MEKS) 2025–2029PolicyIn force

Modernization of Energy and Communal Sectors (MEKS) 2025–2029

The Project provides funds for a comprehensive renovation of networks and facilities for heat, electricity, water supply, and wastewater disposal systems. This includes the modernization of heating networks, pipelines and

5 months agoeff.
INTIEARussian Federation · Implementation roadmap for the development of a battery storage industryPolicyIn force

Implementation roadmap for the development of a battery storage industry

The roadmap highlights the implementation of battery-related projects across more than 100 projects by 2030. Part of this implementation plan will be funded by the federal

5 months agoeff.
INTIEAMexico · 2024 Investment Programs and Projects (PPI) - Electricity NetworksPolicyIn force

2024 Investment Programs and Projects (PPI) - Electricity Networks

In the framework of its Investment Programs and Projects (IPP), the Mexican government is allocating specific funding for the State-owned company to upgrade  electricity network

5 months agoeff.
INTIEARussian Federation · Modernization of public utility infrastructure fundPolicyIn force

Modernization of public utility infrastructure fund

The Fund aims at upgrading public infrastructure in the country, including transmission lines and

5 months agoeff.
INTIEAColombia · Law 2099: Energy Transition LawPolicyIn force

Law 2099: Energy Transition Law

It modifies the tax incentives applicable to non-conventional renewable energy (NCRE) projects and also applies to power

5 months agoeff.
INTIEAEcuador · Comprehensive Support for the Expansion of the Electric SystemPolicyIn force

Comprehensive Support for the Expansion of the Electric System

The Programme aims at strengthening the technical capacity of the electricity sector and improving planning to guarantee energy security. USD 500,000 were earmarked in 2026 for this specific

5 months agoeff.
INTIEAEcuador · Technical emissions standard for stationary sourcesPolicyIn force

Technical emissions standard for stationary sources

The technical standards sets air pollutant limits for stationary installations, including power

5 months agoeff.
INTIEAChile · Energy Access FundPolicyIn force

Energy Access Fund

Chile's Energy Access Fund (FAE) provides funding for energy access small-scale projects focused on renewable energy sources such as solar thermal and solar photovoltaic systems. The objective of the fund is to improve energy access for rural and isolated

5 months agoeff.
INTIEAChile · Law 20.257 on non-conventional renewable energyPolicyIn force

Law 20.257 on non-conventional renewable energy

The Law N° 20,257 better known as Non-Conventional Renewable Energy Law (NCRE Law), enacted on 1 April 2008, aims to fulfill future energy requirements by developing non-conventional renewable energy sources, such as geothermal, wind, solar, tidal, biomass and small…

5 months agoeff.
INTIEAChile · Call for tenders - Electrical energy storage systemsPolicyIn force

Call for tenders - Electrical energy storage systems

The government of Chile announced the bidding for electric energy storage systems in the north of the country for US$ 2 billion, with the aim to begin operations at the end of

5 months agoeff.
INTIEAChile · Law 21505/2022 promoting energy storage and electromobilityPolicyIn force

Law 21505/2022 promoting energy storage and electromobility

The Law amends the General Law of Electrical Services to enable energy storage systems, and to provide for electric vehicles a registration fee exemption for a period of 2

5 months agoeff.
INTIEAColombia · Colombia solar programmePolicyIn force

Colombia solar programme

This measure enables the most vulnerable households to generate their own energy using solar

5 months agoeff.
INTIEABrazil · Law 15.042 which establishes the Brazilian Greenhouse Gas Emissions Trading System (SBCE)PolicyIn force

Law 15.042 which establishes the Brazilian Greenhouse Gas Emissions Trading System (SBCE)

The Law establishes the Brazilian Greenhouse Gas Emissions Trading System (SBCE), and states five phases:  Phase I, for regulation of the SBCE (12-24 months) Phase II, to operationalise emissions reporting for regulated entities (12 months). Phase III, to implement the…

5 months agoeff.
INTIEABrazil · Special Incentives Regime for Infrastructure Development (REIDI): Electricity generation projectsPolicyIn force

Special Incentives Regime for Infrastructure Development (REIDI): Electricity generation projects

Brazil's Special Incentives Regime for Infrastructure Development (REIDI) relieves taxes to facilitate the implementation of renewable electricity generation projects in the

5 months agoeff.
INTIEAUnited States · Inflation Reduction Act 2022: Sec. 13502 Advanced Manufacturing Production CreditPolicyIn force

Inflation Reduction Act 2022: Sec. 13502 Advanced Manufacturing Production Credit

The Inflation Reduction Act (IRA) of 2022, which seeks to reduce domestic inflation – notably brought by the global energy crisis – whilst tackling climate change, establishes a New Advanced Manufacturing Production Credit to incentivise the domestic production of various…

5 months agoeff.
INTIEAUnited States · Inflation Reduction Act 2022: Sec. 13102 Extension and Modification of Energy CreditPolicyIn force

Inflation Reduction Act 2022: Sec. 13102 Extension and Modification of Energy Credit

The U.S. Inflation Reduction Act of 2022 extends the duration of and expands the list of qualifying technologies for existing clean energy investment tax credits. End dates of the tax credits vary according to the technologies, which now include energy storage, microgrid…

5 months agoeff.
INTIEASaudi Arabia · Executive Regulation N°165 For Air QualityPolicyIn force

Executive Regulation N°165 For Air Quality

The Executive Regulation for Air Quality (“Regulation”), issued in 2020 by Royal Decree, aims to implement the air quality rules, standards, requirements and controls set in the 2020 Environment Law. It notably sets standards for air pollutants by industrial activities…

7 months agoeff.
INTIEARepublic of Turkiye · Climate LawPolicyIn force

Climate Law

The Climate Law enables the implementaiton of a national emission trading system (ETS) in 2027 for the industry and power sectors to support Türkiye’s net zero

8 months agoeff.
INTIEACanada · Canada's Clean Energy for Rural and Remote CommunitiesPolicyIn force

Canada's Clean Energy for Rural and Remote Communities

In Canada, there are over 200 communities that rely completely on diesel for heat and power. They often depend on small diesel-based micro-grids for their energy supply that are inefficient, vulnerable to outages, expensive to operate, and contribute to local pollution. The vast…

9 months agoeff.
INTIEAMozambique · Decree n°18/2004 - Regulation to establish environmental quality and emission standardsPolicyIn force

Decree n°18/2004 - Regulation to establish environmental quality and emission standards

This decree provides air pollutants limits for industrial facilities for SOx and NOx.  It also includes limits for vehicles with air pollutant standards for passenger cars, diesel vans, diesel trucks and

11 months agoeff.
INTIEAUnited Kingdom · Long Duration Electricity Storage (LDES) cap and floor schemePolicyIn force

Long Duration Electricity Storage (LDES) cap and floor scheme

A cap and floor scheme ensures investors receive a minimum amount of revenue should their returns fall below a set threshold known as the “floor” to enable investment in LDES assets. Alongside this, the cap on revenue provides returns to consumers for their support, where LDES…

1 year agoeff.
INTIEAPortugal · Investment and Development Plan for the Electricity Distribution Network for the 2023-2025 periodPolicyIn force

Investment and Development Plan for the Electricity Distribution Network for the 2023-2025 period

The Investment and Development Plan for the Electricity Distribution Network establishes the investment projects for the electricity distribution network over a 5-year time horizon, including the respective approved

1 year agoeff.
INTIEAPortugal · Investment and Development Plan for the Electricity Transmission Network for the 2022-2031 periodPolicyIn force

Investment and Development Plan for the Electricity Transmission Network for the 2022-2031 period

The Investment and Development Plan for the Electricity Transmission Network establishes the investment projects for the electricity transmission network over a 10-year time horizon, including the respective approved

1 year agoeff.
INTIEAItaly · Electrification of port berths for the reduction of ship emissions during berthing (cold ironing)PolicyIn force

Electrification of port berths for the reduction of ship emissions during berthing (cold ironing)

The investment is planned to create a network to supply electricity to docks in port areas, along with the necessary infrastructure to connect this network to the national electricity transmission

1 year agoeff.
INTIEARepublic of Turkiye · 2030 Industry and Technology StrategyPolicyIn force

2030 Industry and Technology Strategy

Turkey's 2030 Industry and Technology Strategy aims to establish industrial facilities for nuclear energy, green hydrogen, battery storage, and carbon capture and storage (CCS). The strategy includes setting up clusters for equipment and infrastructure, with a focus on high-tech…

1 year agoeff.
INTIEANew Zealand · Government expenditure in electricity linesPolicyIn force

Government expenditure in electricity lines

The Commerce Commission stated that investment in electricity assets is needed to ensure New Zealanders continue to receive a reliable, safe, and resilient electricity

1 year agoeff.
INTIEASwitzerland · Ordinance on Air Pollution Control (OAPC)PolicyIn force

Ordinance on Air Pollution Control (OAPC)

The Ordinance on Air Pollution Control provides standards and limits for new and existing stationary installations. It was last revised in

1 year agoeff.
INTIEANorway · Feed-in tariffsPolicyIn force

Feed-in tariffs

Statnett, Norway's transmission grid operator, has a production tariff that is based on the amount of electricity delivered to the grid, calculated using the average annual production over the past 10

1 year agoeff.