Global regulations corpus
Browse 15,074 regulations from 36 regulators
2,983 updated in the last 30 days. Public corpus — no signup required to read.
Showing 1–14 of 14 regulations
Using unbound incinerator bottom ash aggregate in construction: RPS 325
Environment Agency regulatory position on using unbound incinerator bottom ash aggregate (IBAA) in construction.
SR2024 No 2: using unbound incinerator bottom ash aggregate in construction
Standard rules for unbound incinerator bottom ash aggregate (IBAA) in construction as a deposit for recovery operation.
NE33 1RW, Keepmoat Homes Limited: environmental permit application advertisement - EPR/XP3228MN/A001
View the application submitted by Keepmoat Homes Limited for Holborn Phase 3, Land off West Holborn Road, South Shields, NE33 1RW.
Grenfell Tower Inquiry Government Progress Report: May 2026
Report on the government’s progress in implementing the Grenfell Tower Inquiry Phase 2 recommendations.
M3 4JH, RENAKER BUILD LIMITED: environmental permit application advertisement - EPR/AP3928MU/A001
View the application submitted by RENAKER BUILD LIMITED for Trinity Islands Building C1 & C2, Land North of Water Street, Manchester, M3 4JH
Minehead coastal defences strengthened with new rock armour
The Environment Agency has completed a £1 million coastal flood defence project at Minehead seafront.
Plug-in solar electrical safety study
UK study testing plug-in solar systems for electrical safety and compatibility with domestic electrical installations to assess suitability and standards compliance.
TQ12 5GP, Persimmon Homes: environmental permit application advertisement - EPR/VP3828MP/A001
Persimmon Homes submitted an environmental permit application (EPR/VP3828MP/A001) for a development project at Langford Bridge, Augustine Road, Newton Abbot, Devon. The application is being advertised for public review.
Red Diesel Replacement competition: successful projects
UK grant programme supporting development and demonstration of low-carbon technological alternatives to red diesel for use in construction, mining and quarrying operations.
National Policy Statements for energy infrastructure
Energy National Policy Statements provide planning guidance for developers of nationally significant energy infrastructure projects in the UK, establishing criteria and procedures for permitting and constructing major energy facilities.
Vital annual beach work reduces flood risk on Lincolnshire coast
Annual beach maintenance work in Lincolnshire involves placement of approximately 300,000 cubic metres of sand to manage coastal flood risk, protecting 20,000 homes and businesses, 24,500 static caravans, and 35,000 hectares of agricultural land.
West Import Resilience Project: Environmental determination
Environmental determination for the West Import Resilience Project, covering a new 9km gas pipeline section between Wormington and Honeybourne and a 2km section in Churchover, UK.
IP16 4UR, Sizewell C Limited, EPR/DB3147LF/V003: environmental permit application advertisement
Sizewell C Limited applied for an environmental permit to install a 340-metre rock armour bund along the seaward side of a Temporary Sea Defence section, located within 16 metres of an existing Sea Defence asset.
RM18 8TX, National Highways Limited: environmental permit application advertisement – EPR/EP3322MT/A001
National Highways Limited submitted an environmental permit application for the Lower Thames Crossing project at West Tilbury. This advertisement notifies the public of the permit application under EPR/EP3322MT/A001.