Global regulations corpus
Browse 12,638 regulations from 36 regulators
2,730 updated in the last 30 days. Public corpus — no signup required to read.
Showing 7,551–7,600 of 10,227 regulations
Notice on feed-in tariff for co-firing generators burning coal and household waste
The Notice regulates the electricity tariff (feed-in tariff) for generators producing electricity from household waste and coal. The FIT for electricity from waste is 0.65 yuan per. The tariff for electricity from coal equals to local coal-generated electricity
Plan for accelerating the development of energy conservation and environmental protection related industries
The plan aims to promote the industrialisation and local manufacturing of energy efficient and clean energy technologies such as boilers, motors, regenerative combustion technology, new energy vehicles, and semi-conductor lighting. The plan also highlights the role of public…
Medium and Long-term Plan of Energy Conservation: 10 Energy Conservation Programmes
Launched in 2004, the Medium and Long-term Plan of Energy Conservation covers the 2005-10 and the 2010-20 period. It details energy conservation aims and implementation plans to be undertaken during the 11th five year period (2006-10) and beyond. The Plan puts forward ten key…
Support for Biogas Projects
As part of its renewable energy targets, established in 2006, the Chinese government is providing more support to biogas projects. This includes the farmers household biogas project, to the value of 40 million RMB, which is helping certain eligible farming families to have…
Energy Conservation in Buildings
Within its 11th Five-Year Period, China plans to reduce residential and public buildings energy consumption by 50%, saving 50 million tons of standard coal. The federal plan for energy conservation in buildings formally mandates: - the quick technical reform of heat-supply…
Policy to promote the deployment of new energy vehicles (NEV) and development of NEV industry in Harbin
The policy of Harbin was put in place in order to implement guidelines issued from the central government on the promotion of New Energy Vehicles (NEVs). The policy note echoes the provisions of the central government guidelines, which include: subsidies for the end-user…
Energy Supply and Consumption Revolution Strategy (2016-2030)
On 25 April 2017, the National Development and Reform Commission (NDRC) and National Energy Administration (NEA) publicly released a strategic paper on "Energy Supply and Consumption Revolution Strategy (2016-2030) €, which sets out the main overall targets and strategies of…
Notice regulating the standardization of the wind power equipment and generators quality
The Notice puts and obligation on provinces to strengthen the quality of wind power equipment and generators through standardize quality checking processes for wind plant equipment and windmills commissioning. The Notice underlines importance of transparent and clear processes…
Energy Conservation in Government
To improve the energy efficiency of government institutions during the 11th Five-Year Period, China required several reforms of government operation: - During reconstruction of government buildings - including heating, air-conditioning and lighting systems - 20 percent of the…
Hong Kong - Tax Incentives for Environmentally Friendly Commercial Vehicles
As of 1 April 2008, Hong Kongs Environmental Protection Department (EPD) has implemented an incentive scheme to encourage investment in environmentally friendly commercial vehicles meeting Euro V emission standards for heavy-duty and light-duty diesel vehicles. Owners of such…
Top 1000 Industrial Energy Conservation Programme
The Office of National Energy Leading Group and the General Administration of Quality Supervision, Inspection and Quarantine are also involved. Beyond the five central governmental agencies, provincial governments (provincial Development and Reform Commission or Economic and…
Notice on the related issues of the application of subsidies based on electric quantity of distributed PV power grid
To implement the State Council "several opinions on promoting the healthy development of photovoltaic industry" (Guo Fa [2013] No. 24), the Ministry of finance to develop distributed photovoltaic power generation project according to the quantity of subsidies. The state of the…
Fund management guidelines for industrial transformation and upgrade (made in China 2025)
The fund management guidelines were set out to support the implementation of the Made in China 2025 strategy. The fund will support projects in the key areas outlined in Made in China 2025 strategy. These include smart manufacturing, smart consumer goods, green manufacturing…
The state council's comments on promote the development of the PV industry
In order to deal with the current problems the PV industry is facing, and further regulate and promote the healthy and sustainable development of this industry, a target that an average annual increase of approximately 10 million kilowatts in PV power installed capacity during…
Adjustment of surcharge of renewable electricity generation
From 25 September 2013, the surcharge for the renewable electricity generation is increased from RMB 0.008/kWh to RMB 0.015/ kWh. Upgraded subside for coal-fired plants with technology to lower emissions of nitrogen oxide from RMB 0.008/kWh to RMB 0.01/
Market entry standards for wind equipment manufacturing industry:
The Chinese government introduced specific regulations to improve the efficiency and competitiveness of the local wind equipment manufacturing market. The new standard first restricts the wind turbine manufacturing market to entities of a minimum production capacity of 2.5 MW.…
GB19576-2004: The minimum allowable values of the energy efficiency and energy efficiency grades for unitary air conditioners
This standard appliies to electric motor-compressor type AC, whose cooling capacity is above 7100W, including unitary AC, ducted and rooftop AC. Does NOT apply to multi split AC(HP) or variable room AC. air-cooled, ductless: EER 2.40; air-cooled, ducted: EER 2.10;…
Interim Measures on Renewable energy development fund Imposition and Management
Policy outlines funding measures, management, supervision and inspection mechanism of Renewable Energy Development Fund. Scheme will continue to support scientific and technological research. Additionally, it will also finance a pilot project for exploiting renewable energy,…
The Renewable Energy Tariff Surcharge Grant Funds Management Approach
To promote renewable energy development and utilization of the specification renewable energy tariff surcharge fund management, improve capital efficiency. Renewable energy power generation projects connected to the grid system occurred in project investment and operation and…
The Notice on Integrating and Accommodating Wind Power 2013
The Notice pointed out that wind curtailment and power regulation has been very serious in some regions in 2012 with rapid development of installed capacity of wind power in China. The abandoned electricity generated by wind power was up to 20TWh throughout the country, so…
Interim procedures of the management of distributed power generation
"Method" exempted distributed power generation projects electricity generation business license, encourage enterprises, professional Energy Service Companies and including individuals, all kinds of electric power customer investment in building and operating distributed…
Comments on support of PV power financial services
In order to maximize leverage to effectively stimulate distributed photovoltaic investments made this comment. Country opened line support various to "self-use priority surplus goes grid national grid control" method for construction and operations of distributed PV power…
National energy administrati on Notice on the development of construction of distributed PV power grid demonstration park
For the expansion of distributed PV Application market, according to the relevant provincial (district, municipal) submitted to the demonstration area implementation plan, identified a first list of distributed PV demonstration area. The 18 demonstration areas are: BEIJING…
Market Transformation Programme - Partnership with the UK
Road map: The road map will summarise the results of this project and make recommendations for a market transformation programme in
Notice on planning the exploitation and utilization of geothermal energy for power and heating
The Notice provides a general guidance on short and long term development of the geothermal power in China for electricity and heat production. The short-term efforts will be focused on the exploitation of the geothermal power from shallow and medium-deep sources. The heat will…
General Work Plan for Energy Conservation and Pollutant Discharge Reduction
The General Work Plan was put forth as a result of missed targets with regards to energy saving and discharge reduction of the last year (2005). More specifically cutting energy consumption per unit GDP by 4% and discharges of major pollutants by 2%. Even more alarming several…
Minimum Energy Performance Standards (MEPS)
In context, the appliance efficiency standards was introduced in 1988 following the Standardization Law of China. The law details rules for management, formulation, and implementation designating the State Council administrative department to oversee the process. The first batch…
863 Key Technology and System Integration Project for Electric Vehicles
RMB 738 million (US$117 million) for battery and EV integration with 42% of funds for battery
Energy Efficiency Leader Scheme
The program aims to set up a long-term mechanism to incentivise leaders in energy efficiency, so called 'Top Runners', which can be products, industry stakeholders and public institutions. To be part of the Top Runner programme, products, industry stakeholders and public…
Conversion of Exhaust Heat and Pressure
Within the 11th Five Year Period (2006 - 2010), the Chinese government has mandated the efficient use of exhaust, pressure and heat from mining and industrial processes. Iron and steel enterprises will - apply coke dry quenching (CDQ) and power generation through the pressure…
Notice on promotion of PV industry by exert the price leverage effect
In order to promote the development and utilization of renewable energy, since September 25, 2013, to other electricity levy charge renewable energy tariff except for residents living and agricultural production to 1.5 cents /
Notice on further promotion of the distributes solar PV systems
The aim of the Notice is to further promote distributed solar PV installation in China. The Notice is directed to the provinces obliging them to strengthen further deployment of small-scale solar PV through: Planning implementation; Provision of financial incentives and…
Supplementary notice on the comprehensive demonstration work on fiscal policy of energy conservation and emission reduction.
Rewards for comprehensive demonstration cities of energy saving and emission financial
Approval on the establishment of non-food biomass feedstock Standardization Technical Committee
It was agreed to establish Non-food Biomass Feedstock Standardization Technical Committee. Committee’s secretariat will be based at the China Agricultural University and it consists out of 29 members. Committee is mainly responsible for China's non-food biomass feedstock…
Interim Measure of Distributed Solar Power Generation On-grid Service Agreement (State Grid)
Target: China plans to increase installed generation capacity for solar power to over 21GW by 2015. State Grid Cooperation for China (SGCC) announced a plan to allow small-scale distributed solar power generators to connect to its power lines and allow solar power generators…
Energy Efficiency Obligation
In 2010, China introduced energy efficiency obligations to attain 14 578 GWh of energy savings per year, achieving an incremental energy savings of 0.04% per year in comparison to total fuel consumption. Electricity used in all sectors are covered in this policy. The obligated…
The Notice on the Establishment of Demonstration Areas for Large-Scale distributed solar PV Power Generation
The Notice mandates provinces to establish demonstration areas for large-scale distributed solar photovoltaic installations in order to further upscale solar generation and utilization in China. Provinces are obliged to select urban area and create large-scale deployment of…
National certification and Implementation Supervision Commission, Energy Bureau on strengthening the photovoltaic products testing and certification work
In order to enhance the construction of the PV products' testing and certification system and regulate the industry's management, the Certification and Accreditation Administration of the People’s Republic of China and the National energy administration of the people's republic…
Notice on issues concerning State Grid Corporation of China to buy distributed PV power generation projects' electricity products invoice etc.
In case of enterprises owned by the state grid buy electricity from distributed photovoltaic project power products, can be issued by the national grid company-owned enterprises free text invoices. Photovoltaic power generation project electricity sales of power products, liable…
China Energy Label Law
In 1999, the China National Institute of Standardization (CNIS) promulgated the process of revising single-period mandatory energy efficiency standards that were more consistent with international best practices. Alongside this development, China Standards Certification Center…
Strategic Plan for Industrial Efficiency
Within the 11th Five-Year Period, Chinas strategic plan for energy efficient industrial processes involves equipment renovation and the design and implementation of process optimization and management measures. Targetting the metallurgical industry, petrochemical industry, and…
Feed-in tariff for onshore and offshore wind
In 2009, the Chinese National Development and Reform Document (NDRD) introduced a feed-in tariff to support the deployment of electricity from onshore wind, applying over a 20 year period. The price setting is divided in four categories according to the wind endowment of the…
Brightness Programme
The Brightness Program is an umbrella program, which includes the Township Electrification Program (TEP) (implemented 2002-2003), and the Village Electrification Program. The TEP included 20 MW of solar PV and wind, and 200 MW of small hydro to provide electricity for more than…
Distributed photovoltaic power generation service guide of China Southern Power Grid Company Limited (Interim)
In order to strengthen services for distributed solar power projects and promote orderly development of photovoltaic industry coordinating, enactment of this service guide. Guide distributed in photovoltaic grid-connected applications, programme formulation and review,…
Management Method for Certification of Energy-saving Products
In 1999, the China National Institute of Standardization (CNIS) promulgated the process of revising single-period mandatory energy efficiency standards that were more consistent with international best practices. Alongside this development, China Standards Certification Center…
Interim procedures of management of the code of practice of PV manufacturing
For the manufacturing industry to strengthen the management of PV, guide the photovoltaic industry to speed up the transformation and upgrading, the enactment of this approach. On the photovoltaic manufacturing industry application and auditing and supervision and management in…
National Energy Conservation Law of China
The China National Institute of Standardization (CNIS), by 1995, was directed to oversee organization of MEPS efforts and revision. Not until 1997, under the National Energy Conservation Law of China, were regulatory mandatory efficiency standards for energy-consuming products…
Design Standard for Residential Buildings 1995
Applicable Building Type(s) New residential Policy Requirement Level Mandatory Governance Development Authority: Ministry of Housing and Urban-Rural Development Implementation Authority: Local governments Enforcement Authority: Local governments Energy…
Renewable Electricity Surcharge
The 2006 Renewable Energy Law stipulates that the additional cost of integrating electricity from renewable energy sources should be shared among the entire electricity system . The 2006 Law then included the Renewable Energy Surcharge , a fixed tariff added to the price of each…
The Notice of further improvement of New Energy Demonstration implementation
National Energy Administration (NEA) is responsible for formation of assessment criteria, planning guiding, evaluation and acceptance management. Provincial energy department is responsible for city initial assessment, and then make the short list of applicant. Municipal energy…