US10 CFR10 CFR Part 715Secondary legislationIn force

Definition of Nonrecourse Project-Financed

This regulation defines 'nonrecourse project-financed' under the Clean Air Act Amendments of 1990 for identifying new independent power production facilities. Nonrecourse project-financed means debt is secured by facility assets and revenues (including electric output sales), with electric utilities having no repayment obligation. Limited guarantees and cost overrun commitments do not disqualify a facility provided the borrower's primary repayment obligation derives from facility revenues. Fully equity-financed projects also qualify.

آخر تعديل قبل 4 ساعات.

العرض المستخرج للقراءة · النص الأصلي للأدلة الامتثالية

PART 715—DEFINITION OF NONRECOURSE PROJECT-FINANCED

§ 715.1 Purpose and scope.

This part sets forth the definition of “nonrecourse project-financed” as that term is used to define “new independent power production facility,” in section 416(a)(2)(B) of the Clean Air Act Amendments of 1990, 42 U.S.C. 7651o(a)(2)(B). This definition is for purposes of section 416(a)(2)(B) only. It is not intended to alter or impact the tax treatment of any facility or facility owner under the Internal Revenue Code and regulations.

§ 715.2 Definitions.

As used in this subpart—

Act means the Clean Air Act Amendments of 1990, 104 Stat. 2399.

Facility means a “new independent power production facility” as that term is used in the Act, 42 U.S.C. 7651o(a)(2).

§ 715.3 Definition of “Nonrecourse Project-Financed”.

Nonrecourse project-financed means when being financed by any debt, such debt is secured by the assets financed and the revenues received by the facility being financed including, but not limited to, part or all of the revenues received under one or more agreements for the sale of the electric output from the facility, and which neither an electric utility with a retail service territory, nor a public utility as defined by section 201(e) of the Federal Power Act, as amended, 16 U.S.C. 824(e), if any of its facilities are financed with general credit, is obligated to repay in whole or in part. A commitment to contribute equity or the contribution of equity to a facility by an electric utility shall not be considered an obligation of such utility to repay the debt of a facility. The existence of limited guarantees, commitments to pay for cost overruns, indemnity provisions, or other similar undertakings or assurances by the facility's owners or other project participants will not disqualify a facility from being “nonrecourse project-financed” as long as, at the time of the financing for the facility, the borrower is obligated to make repayment of the term debt from the revenues generated by the facility, rather than from other sources of funds. Projects that are 100 percent equity financed are also considered “nonrecourse project-financed” for purposes of section 416(a)(2)(B).

المصدر

https://www.ecfr.gov/current/title-10/part-715

الوثيقة الرسمية لدى الجهة التنظيمية. استشهد دائماً بهذا الرابط — لا بصفحة تفاصيل Vantage — في أدلة الامتثال.

ذات صلة في United States

US10 CFR10 CFR Part 14Secondary legislationIn force

Administrative Claims Under Federal Tort Claims Act

10 CFR Part 14 establishes procedural regulations for filing administrative claims under the Federal Tort Claims Act against the United States for property damage, personal injury, or death caused by negligent or wrongful acts of NRC employees. Claims must be filed with the relevant NRC office or the Office of the General Counsel, and the NRC General Counsel is authorized to adjust, determine, compromise, and settle such claims.

قبل 4 ساعات
US10 CFR10 CFR Part 861Secondary legislationIn force

Control of Traffic at Nevada Test Site

This regulation establishes traffic control procedures for the Department of Energy's Nevada Test Site in Nye County, Nevada. It applies to all persons using site streets and authorizes the Nevada Site Office Manager to promulgate specific traffic regulations covering enforcement, traffic signs, speed limits, turning movements, stopping and yielding, pedestrian rights, parking, emergency vehicle privileges, and miscellaneous driving rules.

قبل 4 ساعات
US10 CFR10 CFR Part 100Secondary legislationIn force

Reactor Site Criteria

10 CFR Part 100 establishes site approval criteria for stationary power and testing reactors to ensure public health and safety through defense-in-depth siting principles. The regulation defines exclusion areas where the licensee controls all activities, low population zones where protective measures are feasible, and population center distance requirements, ensuring radiological doses from normal operation and postulated accidents remain acceptably low while accounting for natural hazards and enabling effective emergency planning and security.

قبل 4 ساعات
US10 CFR10 CFR Part 745Secondary legislationIn force

Protection of Human Subjects

10 CFR Part 745 establishes the Federal Policy for the Protection of Human Subjects, applying to all federally-conducted, supported, or regulated research involving human subjects. Department heads determine coverage and may grant waivers consistent with Belmont Report principles. The policy permits equivalent foreign procedures and does not supersede state, local, tribal, or foreign laws providing additional protections.

قبل 4 ساعات
US10 CFR10 CFR Part 727Secondary legislationIn force

Consent for Access to Information on Department of Energy Computers

This regulation establishes minimum requirements for individuals accessing Department of Energy computers, mandating written consent acknowledging no expectation of privacy and permitting authorized investigative agency access during employment and for three years thereafter. DOE contractors must obtain and maintain written acknowledgments from employees and subcontractor employees before granting computer access.

قبل 4 ساعات