Energy infrastructure development applications: decisions
Decisions by the Secretary of State on energy infrastructure applications.
- From:
- Department for Energy Security and Net Zero
- Published
- 1 January 2000
- Last updated
- 3 July 2026 — See all updates
Decisions made by the Secretary of State on energy infrastructure applications include:
- Development Consent Orders (DCOs) under the Planning Act 2008 (PA 2008)
- Material Changes (MC) and Non-Material Changes (NMC) to DCOs under the PA 2008
- correction of errors in DCOs under the PA 2008
- post consent condition discharges for DCOs under the PA 2008
- applications for consent under section 36 (s.36) of the Electricity Act 1989 (EA 1989)
- variations to existing s.36 consents under s.36C of the EA 1989
- post consent condition discharges for s.36 of the EA 1989
- applications made under the Transport and Works Act 1992 (TWA 1992)
- overhead line applications under section 37 (s.37) of the EA 1989 following a Public Inquiry
- Compulsory Purchase Orders (CPOs) for electricity infrastructure
- Directions under section 35 (s.35) of the PA 2008
- Environmental Impact Assessment screening and scoping opinions under the Electricity Works (Environmental Impact Assessment) (England and Wales) Regulations 2017 (2017 EIA Regs)
- Safety Zones for offshore renewable energy installations under the Energy Act 2004 (EA 2004)
Archived Energy Infrastructure site
The previous Energy Infrastructure pages have been archived. Please check the archive if you are looking for decisions made between 2005 and 2017.
2026
-
- 2 July 2026
- Decision
-
- 2 July 2026
- Decision
-
- 15 June 2026
- Decision
-
- 11 June 2026
- Decision
-
- 5 June 2026
- Decision
-
- 5 June 2026
- Decision
-
- 5 June 2026
- Decision
-
- 21 May 2026
- Decision
-
- 14 May 2025
- Decision
-
- 19 May 2026
- Decision
-
- 14 May 2026
- Decision
-
- 14 May 2026
- Decision
-
- 29 April 2026
- Decision
-
- 23 April 2026
- Decision
-
- 23 April 2026
- Decision
-
- 8 April 2026
- Decision
-
- 8 April 2026
- Decision
-
- 2 April 2026
- Decision
-
- 6 March 2026
- Decision
-
- 3 March 2026
- Decision
-
- 24 February 2026
- Decision
-
- 20 February 2026
- Decision
-
- 18 February 2026
- Decision
-
- 10 February 2026
- Decision
-
- 29 January 2026
- Decision
-
- 8 January 2026
- Decision
2025
-
- 22 December 2025
- Decision
-
- 19 December 2025
- Decision
-
- 19 December 2025
- Decision
-
- 17 December 2025
- Decision
-
- 3 December 2025
- Decision
-
- 3 December 2025
- Decision
-
- 1 December 2025
- Decision
-
- 21 November 2025
- Decision
-
Cory Decarbonisation: decision on an application for development consent under the Planning Act 2008
- 5 November 2025
- Decision
-
- 23 October 2025
- Decision
-
- 24 October 2025
- Decision
-
- 10 October 2025
- Decision
-
- 8 October 2025
- Decision
-
- 14 October 2025
- Decision
-
- 25 September 2025
- Decision
-
- 25 September 2025
- Decision
-
- 25 September 2025
- Decision
-
- 22 October 2025
- Decision
-
- 8 September 2025
- Decision
-
- 29 August 2025
- Decision
-
- 27 August 2025
- Decision
-
- 21 August 2025
- Decision
-
- 19 August 2025
- Notice
-
- 13 August 2025
- Decision
-
- 13 August 2025
- Decision
-
- 5 August 2025
- Decision
-
- 25 July 2025
- Decision
-
- 23 July 2025
- Decision
-
- 4 July 2025
- Decision
-
- 19 June 2025
- Decision
-
- 10 June 2025
- Decision
-
- 4 June 2025
- Notice
-
- 22 May 2025
- Decision
-
- 14 May 2025
- Decision
-
- 14 May 2025
- Decision
-
- 13 May 2025
- Decision
-
- 9 May 2025
- Decision
-
- 7 May 2025
- Research and analysis
-
- 25 April 2025
- Decision
-
- 23 April 2025
- Decision
-
- 11 April 2025
- Decision
-
- 11 April 2025
- Decision
-
- 9 April 2025
- Decision
-
- 9 April 2025
- Decision
-
- 8 April 2025
- Decision
-
- 7 April 2025
- Decision
-
- 4 April 2025
- Decision
-
- 20 March 2025
- Decision
-
- 13 March 2025
- Decision
-
- 12 February 2025
- Decision
-
- 7 February 2025
- Decision
-
Sheringham and Dudgeon offshore wind farm extension projects: Non-Material Change, Planning Act 2008
- 6 February 2025
- Decision
-
- 24 January 2025
- Decision
-
- 24 January 2025
- Decision
2024
-
- 19 December 2024
- Decision
-
- 22 November 2024
- Decision
-
- 22 November 2024
- Decision
-
- 11 November 2024
- Decision
-
- 5 November 2024
- Decision
-
- 1 November 2024
- Decision
-
- 1 November 2024
- Decision
-
- 17 October 2024
- Decision
-
- 10 October 2024
- Decision
-
- 1 October 2024
- Decision
-
- 30 September 2024
- Decision
-
- 12 September 2024
- Decision
-
- 12 September 2024
- Decision
-
- 28 August 2024
- Decision
-
- 23 August 2024
- Decision
-
- 5 September 2024
- Decision
-
- 1 August 2024
- Decision
-
- 1 August 2024
- Decision
-
Staythorpe Power Station, EIA scoping opinion: variation to section 36 consent, Electricity Act 1989
- 31 July 2024
- Decision
-
- 24 July 2024
- Decision
-
- 17 July 2024
- Decision
-
- 12 July 2024
- Decision
-
- 12 July 2024
- Decision
-
- 12 July 2024
- Decision
-
- 11 June 2024
- Decision
-
- 7 June 2024
- Decision
-
- 5 June 2024
- Decision
-
- 23 May 2024
- Decision
-
- 21 May 2024
- Decision
-
- 15 May 2024
- Decision
-
- 9 May 2024
- Decision
-
- 23 April 2024
- Decision
-
- 17 April 2024
- Decision
-
- 16 April 2024
- Decision
-
- 4 April 2024
- Decision
-
- 27 March 2024
- Decision
-
- 26 March 2024
- Decision
-
- 20 March 2024
- Decision
-
- 14 March 2024
- Decision
-
- 14 March 2024
- Decision
-
- 5 March 2024
- Decision
-
- 29 February 2024
- Decision
-
- 29 February 2024
- Decision
-
- 23 February 2024
- Decision
-
- 16 April 2024
- Decision
-
- 20 February 2024
- Decision
-
- 16 February 2024
- Decision
-
- 16 January 2024
- Decision
2023
-
- 13 December 2023
- Decision
-
- 2 February 2024
- Decision
-
- 28 November 2023
- Decision
-
- 23 November 2023
- Decision
-
- 22 November 2023
- Decision
-
- 15 November 2023
- Decision
-
- 13 October 2023
- Decision
-
- 26 September 2023
- Decision
-
- 20 September 2023
- Decision
-
- 6 September 2023
- Decision
-
- 23 August 2023
- Decision
-
- 18 August 2023
- Decision
-
- 12 July 2023
- Decision
-
- 12 July 2023
- Decision
-
- 7 July 2023
- Decision
-
- 26 June 2023
- Decision
-
- 15 June 2023
- Decision
-
- 25 May 2023
- Decision
-
- 4 May 2023
- Decision
-
- 17 April 2023
- Decision
-
- 9 March 2023
- Decision
-
- 24 February 2023
- Decision
-
- 16 February 2023
- Decision
2022
-
- 22 December 2022
- Decision
-
- 6 December 2022
- Decision
-
- 7 December 2022
- Decision
-
- 14 November 2022
- Decision
-
- 23 April 2024
- Decision
-
- 6 October 2022
- Decision
-
- 6 October 2022
- Decision
-
- 30 September 2022
- Decision
-
- 28 September 2022
- Decision
-
- 20 September 2022
- Decision
-
- 26 August 2022
- Decision
-
- 3 August 2022
- Decision
-
- 28 July 2022
- Decision
-
- 20 July 2022
- Decision
-
- 5 July 2022
- Decision
-
- 13 July 2022
- Decision
-
- 13 July 2022
- Decision
-
- 17 June 2022
- Decision
-
- 13 June 2022
- Decision
-
- 24 May 2022
- Decision
-
- 5 April 2022
- Decision
-
- 31 March 2022
- Decision
-
- 31 March 2022
- Decision
-
- 26 May 2022
- Notice
-
- 16 February 2022
- Decision
-
- 11 February 2022
- Decision
-
- 20 January 2022
- Decision
2021
-
- 10 December 2021
- Decision
-
- 17 December 2021
- Decision
-
- 17 December 2021
- Decision
-
- 17 December 2021
- Decision
-
- 10 November 2021
- Notice
-
- 24 September 2021
- Decision
-
- 17 September 2021
- Decision
-
- 18 August 2021
- Decision
-
- 24 May 2021
- Decision
-
- 24 May 2021
- Notice
-
- 12 May 2021
- Decision
-
- 29 April 2021
- Decision
-
- 15 April 2021
- Decision
-
- 12 April 2021
- Decision
-
- 19 February 2021
- Decision
-
- 18 February 2021
- Decision
-
- 4 February 2021
- Decision
-
- 4 February 2021
- Decision
-
- 28 January 2021
- Decision
-
- 22 January 2021
- Decision
-
- 14 January 2021
- Decision
2020
-
- 31 December 2020
- Decision
-
- 30 November 2020
- Decision
-
- 11 November 2020
- Decision
-
- 30 October 2020
- Decision
-
- 21 October 2020
- Decision
-
- 7 October 2020
- Decision
-
- 22 September 2020
- Decision
-
- 7 August 2020
- Decision
-
- 27 July 2020
- Decision
-
- 1 July 2020
- Decision
-
- 3 June 2020
- Decision
-
- 28 May 2020
- Decision
-
- 9 April 2020
- Decision
-
- 26 March 2020
- Decision
-
- 20 March 2020
- Decision
-
- 20 February 2020
- Decision
-
- 12 February 2020
- Decision
-
- 17 January 2020
- Decision
2019
-
- 20 December 2019
- Decision
-
- 24 October 2019
- Decision
-
- 4 October 2019
- Decision
-
- 19 September 2019
- Decision
-
- 12 September 2019
- Decision
-
- 10 July 2019
- Decision
-
- 5 July 2019
- Decision
-
- 6 June 2019
- Decision
-
- 29 April 2019
- Decision
-
- 17 April 2019
- Decision
-
- 9 April 2019
- Decision
-
- 5 April 2019
- Decision
-
- 25 March 2019
- Decision
-
- 13 March 2019
- Decision
-
- 8 March 2019
- Decision
2018
-
- 10 December 2018
- Decision
-
- 20 September 2018
- Decision
-
- 19 September 2018
- Decision
-
- 22 August 2018
- Decision
-
- 3 August 2018
- Decision
-
- 30 July 2018
- Decision
-
- 19 July 2018
- Decision
-
- 27 June 2018
- Decision
-
- 6 June 2018
- Decision
-
- 4 May 2018
- Decision
-
- 23 March 2018
- Decision
-
- 22 March 2018
- Decision
-
- 31 January 2018
- Decision
-
- 12 January 2018
- Decision
Updates to this page
-
3 July 2026
Published Peartree Hill Solar Farm: Development Consent Order, Planning Act 2008.
-
2 July 2026
Published Dean Moor Solar Farm: development consent order, Planning Act 2008.
-
15 June 2026
Published Westermost Rough Offshore Wind Farm: application for a safety zone, Energy Act 2004.
-
11 June 2026
Published the Trafford Power Project: Screening decision, the Electricity Works (Environmental Impact Assessment) Regulations 2017.
-
9 June 2026
Published the West Import Resilience Project: Environmental determination.
-
9 June 2026
Published the Cory Decarbonisation Project: Correction of errors, Planning Act 2008 and Morecambe Offshore Wind Farm Generation Assets: Correction of errors, Planning Act 2008.
-
3 June 2026
Published Morecambe Offshore Windfarm Generation Assets: decision on application for development consent under the Planning Act 2008.
-
22 May 2026
Published the Sunnica Energy Farm: non-material change, Planning Act 2008.
-
21 May 2026
Published North Lincolnshire Green Energy Park Order 2025: correction of errors, Planning Act 2008.
-
19 May 2026
Published the Project Union: East Coast - section 35 direction, Planning Act 2008.
-
15 May 2026
Published the Dogger Bank South Offshore Wind Farms: development consent order, Planning Act 2008.
-
14 May 2026
Published the North Falls Offshore Wind Farm: development consent order, Planning Act 2008
-
1 May 2026
Published National Grid Electricity Transmission (Birkhill Wood Substation Project): Compulsory Purchase Order 2025.
-
23 April 2026
Published Rampion 2 Offshore Wind Farm Order 2025: correction of errors, Planning Act 2008.
-
9 April 2026
Published The Morgan Offshore Wind Project Generation Assets Order 2025: Correction of errors, Planning Act 2008.
-
8 April 2026
Published Springwell Solar Farm Project: development consent order, Planning Act 2008.
-
2 April 2026
Published North Killingholme Power Project: non-material change, Planning Act 2008.
-
6 March 2026
Published East Anglia Two offshore wind farm: 2026 post-consent condition discharge, Planning Act 2008.
-
4 March 2026
Published VPI Immingham: Compulsory Purchase Order 2024.
-
3 March 2026
Published H2East Pipeline: Humber to Nottinghamshire - section 35 direction, Planning Act 2008.
-
24 February 2026
Published Longfield Solar Farm: non-material change, Planning Act 2008.
-
19 February 2026
Published Fenwick Solar Farm: development consent order, Planning Act 2008.
-
10 February 2026
Published Outer Dowsing Offshore Wind Farm: development consent order, Planning Act 2008.
-
29 January 2026
Added East Anglia Two offshore wind farm: 2026 post-consent condition compliance, Planning Act 2008.
-
8 January 2026
Published East Anglia THREE Offshore Wind Farm: post-consent condition discharge, Planning Act 2008.
-
23 December 2025
Published Hornsea Three Offshore Wind Farm: application for a safety zone, Energy Act 2004.
-
22 December 2025
Added 2 decisions on non-material changes for Norfolk Vanguard and Norfolk Boreas.
-
17 December 2025
Added Five Estuaries Offshore Wind Farm: development consent order, Planning Act 2008.
-
5 December 2025
Published Hinkley Point C New Nuclear Power Station: post-consent approval request, Planning Act 2008.
-
3 December 2025
Published Helios Renewable Energy Project: decision on an application for development consent under the Planning Act 2008.
-
21 November 2025
Added Dogger Bank Creyke Beck: Non-Material Change, Planning Act 2008.
-
6 November 2025
Published Cory Decarbonisation: decision on an application for development consent under the Planning Act 2008.
-
24 October 2025
Published Stonestreet Green Solar Project: decision on application for development consent under the Planning Act 2008.
-
24 October 2025
Published Byers Gill Solar Order 2025: correction of errors, Planning Act 2008.
-
21 October 2025
Published Longfield Solar Farm: post-consent agreement amendment, Town and Country Planning Act 1990.
-
14 October 2025
Published Oaklands Farm Solar Park Order 2025: Correction of errors, Planning Act 2008.
-
14 October 2025
Published Tillbridge Solar Project: decision on application for development consent under the Planning Act 2008.
-
10 October 2025
Added National Grid Electricity Transmission (Grain to Tilbury): Compulsory Purchase Order 2024.
-
29 September 2025
Published Tilbury to Gravesend Tunnel Replacement Project: Section 37 consent, Electricity Act 1989.
-
26 September 2025
Published Marram Energy Storage and Decarbonisation Hub Project (MESH): section 35 direction, Planning Act 2008.
-
22 September 2025
Published Spalding Energy Expansion Generating Station: Section 36 Consent Variation, Electricity Act 1989.
-
9 September 2025
Published Lighthouse Green Fuels Project: section 35 direction, Planning Act 2008.
-
29 August 2025
Published Morgan Offshore Wind Project Generation Assets: Section 35 Direction, Planning Act 2008.
-
27 August 2025
Added Cory Heat Main 1 Project: Section 35 Direction, Planning Act 2008.
-
22 August 2025
Added Viking CCS Carbon Dioxide Pipeline Correction Order 2025.
-
21 August 2025
Added Hope Moor wind farm section 35 direction, Planning Act 2008.
-
20 August 2025
Added East Anglia One and Two North Offshore Wind Farms: post-consent condition compliance, Planning Act 2008
-
5 August 2025
Published East Anglia One North and East Anglia Two Offshore Windfarms Red-Throated Diver Implementation and Monitoring Plan: post-consent condition discharge, Planning Act 2008.
-
25 July 2025
Added East Anglia One North and East Anglia Two Offshore Windfarms: post-consent condition compliance.
-
23 July 2025
Added a link to Byers Gill Solar: development consent order, Planning Act 2008.
-
4 July 2025
Added Mona Offshore Wind Farm: development consent order, Planning Act 2008.
-
19 June 2025
Added a link to Oaklands Farm Solar Park: development consent order, Planning Act 2008.
-
10 June 2025
Added the Humber Hydrogen Pipeline Project: section 35 direction.
-
4 June 2025
Added a link to the West Burton Solar Project decision.
-
28 May 2025
Added corrections to the Rivenhall Generating Station Extension Order 2024, and Immingham open cycle gas turbine: non-material change, Planning Act 2008.
-
14 May 2025
Published Eastern Green Link 5 Project: section 35 direction, Planning Act 2008.
-
14 May 2025
Added Gas pipeline diversion, West Winch, environmental determination: Electricity Works (EIA) Regulations 2017.
-
12 May 2025
Published East Yorkshire Solar Farm: development consent order, Planning Act 2008.
-
7 May 2025
Added Review of consents for major infrastructure projects, SPAs and SACs: habitats regulations.
-
25 April 2025
Published Ferrybridge Multifuel 2 generating station: non-material change (2025), Planning Act 2008.
-
24 April 2025
Published Bramford to Twinstead Reinforcement Order 2025: correction of errors, Planning Act 2008.
-
23 April 2025
Added Calderdale Energy Park: section 35 direction, Planning Act 2008.
-
23 April 2025
Published Heckington Fen Solar Park: correction of errors, Planning Act 2008.
-
23 April 2025
Updated the decisions list to include 'correction of errors in DCOs under the PA 2008'.
-
15 April 2025
Added Hornsea Project Four offshore wind farm: non-material change (2025), Planning Act 2008.
-
9 April 2025
Added link to Viking CCS pipeline project: development consent order, Planning Act 2008.
-
7 April 2025
Published Tarchon Interconnector Project: section 35 direction, Planning Act 2008.
-
4 April 2025
Added link to Rampion 2 offshore wind farm extension project: development consent order Planning Act 2008.
-
20 March 2025
Added Hornsea Four Offshore Windfarm: post-consent condition discharge, Planning Act 2008.
-
13 March 2025
Added North Lincolnshire Green Energy Park development consent order decision.
-
25 February 2025
Added National Grid Electricity Transmission (Scotland to England Green Link 2): compulsory purchase order 2023.
-
7 February 2025
Sheringham and Dudgeon offshore wind farm extension projects: Non-Material Change has been published.
-
7 February 2025
East Anglia One North and East Anglia Two Offshore Windfarms post-consent condition discharge has been added.
-
24 January 2025
West Burton Solar Farm and Heckington Fen Solar Park decisions added.
-
15 January 2025
Published direction by the Secretary of State on the North Killingholme (Generating Station) Order 2014.
-
19 December 2024
Added DCO decision on Rivenhall Integrated Waste Management Facility.
-
27 November 2024
Added: National Grid Electricity Transmission (Pitsmoor-Wincobank-Templeborough cable replacement): CPO, and H2NorthEast Project: S35 Direction.
-
13 November 2024
Added Dogger Bank Teesside A / Sofia Offshore Wind Farm: non-material change, Planning Act 2008.
-
8 November 2024
Added Longfield Solar Farm post consent condition compliance Planning Act 2008.
-
1 November 2024
Added Little Barford Power Station and Staythorpe Power Station post-consent condition compliance,
-
17 October 2024
Added East Irish Sea Transmission Project: Section 35 direction, Planning Act 2008.
-
11 October 2024
Added Ossian offshore transmission infrastructure: section 35 direction, Planning Act 2008.
-
1 October 2024
Added Great Yarmouth power station: section 36 consent variation.
-
30 September 2024
Added Dogger Bank C: application for a safety zone, Energy Act 2004.
-
13 September 2024
Added Bramford to Twinstead Network Reinforcement: development consent order, Planning Act 2008.
-
12 September 2024
Added Thurrock flexible generation plant, non material change (2024) - Planning Act 2008.
-
6 September 2024
Added Pembroke Power Station, EIA scoping opinion: variation to section 36 consent, Electricity Act 1989.
-
6 September 2024
Added Cottam Solar Project: development consent order decision link.
-
3 September 2024
Added National Grid Electricity Transmission compulsory purchase orders for Harker Energy Enablement Project and the Scotland to England Green Link 1.
-
1 August 2024
Added EIA scoping opinion on Staythorpe power station.
-
24 July 2024
Added Cadent Appleby Lodge gas pipeline diversion: environmental determination.
-
23 July 2024
Added Hornsea Project Four Offshore Wind Farm non material change decision.
-
12 July 2024
Added Mallard Pass Solar Farm, Sunnica Solar Farm and Gate Burton Solar Farm development consent orders.
-
17 June 2024
Added 'Coryton power station: section 36 consent variation, Electricity Act 1989'.
-
17 June 2024
Added 'Grain B power station scoping opinion for Environmental Impact Assessment: variation to section 36 consent, Electricity Act 1989'.
-
23 May 2024
Added Ossian and IceWind directions.
-
15 May 2024
Added link to Keuper underground gas storage non-material change decision.
-
13 May 2024
Added 'Hornsea Three Offshore Wind Farm: non-material change'.
-
23 April 2024
Added Lighthouse Green Fuels Project: section 35 varied direction, Planning Act 2008.
-
18 April 2024
Added Sheringham and Dudgeon offshore wind farm: development consent order Planning Act 2008.
-
16 April 2024
Added Ferrybridge Carbon Capture and Storage Project: section 35 varied direction, Planning Act 2008.
-
9 April 2024
Added VPI Immingham Open Cycle Gas Turbine (OCGT): non-material change and Burbo Bank offshore wind farm: Section 36 Consent Variation Application.
-
3 April 2024
Added Cadent Gas, gas pipeline diversion, Public Gas Transporter Pipeline Works (EIA) Regulations 1999.
-
20 March 2024
Added HyNet Carbon Dioxide Pipeline Project: development consent order Planning Act 2008.
-
19 March 2024
Added Orsted Hornsea Project Three (UK), compulsory purchase order 2023.
-
14 March 2024
Added Yorkshire Green Energy Enablement Project: development consent order Planning Act 2008.
-
6 March 2024
Added Morven transmission assets project: Section 35 Direction, Planning Act 2008.
-
29 February 2024
Added Eastern Green Link 3 / 4 Projects: section 35 direction, Planning Act 2008.
-
28 February 2024
Added National Grid London Power Tunnels: compulsory purchase order.
-
23 February 2024
Added Ferrybridge Carbon Capture and Storage Project: section 35 direction, Planning Act 2008.
-
20 February 2024
Added Medworth Energy from Waste CHP facility: development consent order Planning Act 2008.
-
20 February 2024
Added Net Zero Teesside Project: development consent order Planning Act 2008.
-
16 January 2024
Added Drax bioenergy with carbon capture and storage project: development consent order Planning Act 2008.
-
18 December 2023
Added latest decisions.
-
8 December 2023
Added latest decisions.
-
16 November 2023
Added decision on gas pipeline replacement between Derwenlas and Tywyn.
-
7 November 2023
New screening decisions added.
-
26 September 2023
Added 'Xlinks Morocco – UK Power Project: section 35 direction, Planning Act 2008'.
-
21 September 2023
Added 'Awel y Môr offshore wind farm: development consent order Planning Act 2008'.
-
14 September 2023
Added Gas pipeline diversion, Stanton Cross Development: Public Gas Transporter Pipeline Works (Environmental Impact Assessment) Regulations 1999.
-
4 September 2023
Added Gas pipeline diversion, A66 near Penrith: Public Gas Transporter Pipeline Works (Environmental Impact Assessment) Regulations 1999.
-
18 August 2023
Added Sofia offshore wind farm: application for a safety zone, Energy Act 2004.
-
12 July 2023
Added Burbo Bank wind farm EIA screening opinion, and Hornsea Project Four offshore wind farm development consent order decision.
-
7 July 2023
Added Boston Alternative Energy Facility: development consent order, Planning Act 2008.
-
26 June 2023
Added Longfield Solar Farm decision.
-
23 June 2023
Added Little Crow Solar Farm: non-material change, Planning Act 2008.
-
19 April 2023
Added Hornsea Three offshore wind farm: non-material change, s39 Planning Act 2008 decision.
-
24 March 2023
Added Thurrock Flexible Generation Plant: non-material change, Planning Act 2008.
-
13 March 2023
Dogger Bank B offshore windfarm decision added.
-
28 February 2023
Non-material change on Riverside Energy Park published.
-
30 December 2022
Added H2 Teesside S.35 direction.
-
8 December 2022
Added decision on Lostock sustainable energy plant.
-
7 December 2022
Keadby 3 decision added.
-
14 November 2022
Rye House Power Station combined cycle gas turbine: variation to section 36 consent, Electricity Act 1989 added to page.
-
25 October 2022
Lighthouse Green Fuels Project added.
-
7 October 2022
Cory Decarbonisation Project added.
-
5 October 2022
3 recent decisions added: Norfolk Boreas, Norfolk Vanguard and Morgan / Morecambe offshore wind farms.
-
4 October 2022
East Anglia Three offshore wind farm: non-material change (2022), Planning Act 2008 added.
-
24 August 2022
Added Eurolink multi-purpose interconnector, Section 35 Direction, Planning Act 2008.
-
4 August 2022
Tilbury Green Power decision added.
-
28 July 2022
Heckington Fen decision added.
-
20 July 2022
Added link to Sizewell C decision.
-
8 July 2022
Added Cadent Hynet and Dogger Bank decisions.
-
28 June 2022
Staythorpe and Little Barford Generating Stations added.
-
17 June 2022
Spalding Energy Project and Dogger Bank A decisions added.
-
5 April 2022
Added INRG Solar (Little Crow) Limited: Development Consent Order, Planning Act 2008 decision.
-
1 April 2022
Added East Anglia ONE North and East Anglia TWO decisions on applications for construction and operation of offshore windfarms.
-
31 March 2022
Added National Grid Electricity Transmission - Sea Link electricity interconnector decision.
-
22 February 2022
Thurrock Flexible Generation Plant added.
-
11 February 2022
Added Norfolk Vanguard Ltd decision.
-
14 January 2022
Hinkley Point C new nuclear power station decision added.
-
17 December 2021
Llanbrynmair and Riverside Resource Recovery Facility decisions added.
-
11 November 2021
Added South Humber Bank Energy Centre generating station: development consent order, Planning Act 2008.
-
30 September 2021
East Anglia ONE and C.GEN Killingholme decisions added.
-
18 August 2021
National Grid Ventures (NGV) continental link decision added.
-
14 June 2021
Little Barford and Staythorpe power stations: screening opinions added.
-
7 June 2021
Added Greenlink Interconnector Limited, Compulsory Purchase Order decision.
-
12 May 2021
Rampion Offshore Wind Farm and Lostock Sustainable Energy Plant decisions added.
-
19 April 2021
East Anglia THREE Limited: non-material change, Planning Act 2008 decision added.
-
4 March 2021
Wheelabrator Kemsley decision added.
-
23 February 2021
Decision on National Grid London Power Tunnels 2 Compulsory Purchase Order and Scoping opinion on Riverside Resource Recovery Facility added.
-
4 February 2021
Tilbury Green s36c variation decision added.
-
28 January 2021
Enfield power station: variation to section 36 consent, Electricity Act 1989 added.
-
22 January 2021
Teesside A Offshore Wind Farm Limited: Non-Material Change, Planning Act 2008 decision added.
-
15 January 2021
Sofia Offshore Wind Farm Limited: decision on non-material change added.
-
7 January 2021
Hornsea Project Three offshore windfarm: link to development consent order decision added.
-
6 January 2021
Sofia Offshore Wind Farm Limited and Doggerbank Offshore Wind Farm Project 3 Projco Limited: decision added.
-
11 November 2020
Gateway Energy Centre decision added.
-
30 October 2020
Decision on Llandinam wind farm, Powys, Wales added.
-
21 October 2020
West Burton C and Southampton/London pipeline decisions added.
-
8 October 2020
Hornsea Two offshore wind farm decision added.
-
10 August 2020
VPI Immingham B Limited decision added.
-
28 July 2020
Progress Power Limited decision added.
-
7 July 2020
Norfolk Vanguard offshore windfarm decision added.
-
3 June 2020
Thanet Extension Offshore Wind Farm and Cleve Hill Solar Park decisions added.
-
19 May 2020
Riverside Energy Park: Development Consent Order decision added.
-
1 April 2020
Tilbury Green decision added.
-
23 March 2020
North Shropshire Electricity Distribution Network: reinforcement to Development Consent Order added.
-
24 October 2019
Knapton generating station: screening opinion added.
-
7 October 2019
Drax Re-Power decision added.
-
23 September 2019
Abergelli Power decision added.
-
13 September 2019
Llandinam screening opinion added.
-
10 July 2019
Lostock varation to S.36 decision added.
-
5 July 2019
Kemsley Mill decision added.
-
6 June 2019
East Anglia THREE offshore wind farm decision added.
-
29 April 2019
Added Direction on Nautilus interconnector.
-
26 March 2019
SoS decision on Sofia windfarm added.
-
13 March 2019
Millbrook Power Limited decision added.
-
13 December 2018
King's Lynn gas fired power station decision added.
-
1 January 2000
First published.
Explore the topic
Is this page useful?
- Maybe
- Yes this page is useful
- No this page is not useful
Help us improve GOV.UK
Do not include personal or financial information like your National Insurance number or credit card details.
Help us improve GOV.UK
To help us improve GOV.UK, we’d like to know more about your visit today. Please fill in this survey (opens in a new tab and requires JavaScript).
CancelServices and information
- Benefits
- Births, death, marriages and care
- Business and self-employed
- Childcare and parenting
- Citizenship and living in the UK
- Crime, justice and the law
- Disabled people
- Driving and transport
- Education and learning
- Employing people
- Environment and countryside
- Housing and local services
- Money and tax
- Passports, travel and living abroad
- Visas and immigration
- Working, jobs and pensions
Support links
- Help
- Privacy
- Cookies
- Accessibility statement
- Contact
- Terms and conditions
- Rhestr o Wasanaethau Cymraeg
- Government Digital Service
المصدر
https://www.gov.uk/government/collections/energy-infrastructure-development-applications-decisionsالوثيقة الرسمية لدى الجهة التنظيمية. استشهد دائماً بهذا الرابط — لا بصفحة تفاصيل Vantage — في أدلة الامتثال.