مجموعة اللوائح العالمية
تصفح 15,074 لائحة من 36 جهة تنظيمية
2,983 تم تحديثها في آخر 30 يومًا. مجموعة عامة — لا حاجة إلى تسجيل للقراءة.
عرض 1–27 من أصل 27 لائحة
Using unbound incinerator bottom ash aggregate in construction: RPS 325
Environment Agency regulatory position on using unbound incinerator bottom ash aggregate (IBAA) in construction.
Plug-in solar: Regulatory amendment and interim product specification
We're seeking views on proposals to enable the safe and legal use of plug-in solar (plug-in microgeneration) products in the UK.
WEEE: evidence and national protocols guidance
How to issue evidence, meet and report on recovery and recycling targets and apply protocols on waste electrical and electronic equipment (WEEE).
Eskdalemuir seismic array: revised approach to managing onshore wind turbine interference
Proposals for an updated approach to managing onshore wind turbine interference with the Eskdalemuir seismic array.
SR2024 No 2: using unbound incinerator bottom ash aggregate in construction
Standard rules for unbound incinerator bottom ash aggregate (IBAA) in construction as a deposit for recovery operation.
Waste electrical and electronic equipment (WEEE) public registers
Registers of electrical and electronic equipment (EEE) producers, approved exporters, approved authorised treatment facilities and producer compliance schemes.
Recovering unused waste plastics coded 16 03 06: RPS 273
Environment Agency regulatory position on storing, treating and using plastic waste coded 16 03 06, when this waste code is not in your environmental permit or waste exemption.
Large Load Controllers: Tier 1 Cyber Assessment Framework and associated guidance
We're seeking views on a proposed Cyber Assessment Framework (CAF) profile for large electricity load controllers.
Joint Statement on Asbestos in Consumer Products
Joint Statement from OPSS, UKHSA and HSE.
Compliance with BAT-AELs for indirect emissions to water at chemical waste treatment installations: RPS 371
Environment Agency regulatory position on when you cannot comply with best available techniques associated emission limits (BAT-AELs) for certain substances discharged to sewer at chemical waste treatment installations.
Assessment and rating of noise from wind turbines: guidance
This report provides technical guidance for assessing and controlling operational noise from wind turbines.
Assessment and rating of wind turbine noise guidance: proposed updates
We're seeking views on updates to guidance on the assessment of noise from onshore wind turbines across the UK.
Grenfell Tower Inquiry Government Progress Report: May 2026
Report on the government’s progress in implementing the Grenfell Tower Inquiry Phase 2 recommendations.
Non-domestic Private Rented Sector minimum energy efficiency standards: EPC B implementation
We're seeking views on the government's proposed framework to improve implementation and enforcement of the EPC B target by 2030 for privately rented non-domestic buildings.
New nuclear power stations: assessing reactor designs
The Environment Agency conducts Generic Design Assessments (GDA) to evaluate new nuclear reactor designs for regulatory compliance. This guidance outlines the GDA process and the Agency's engagement with stakeholders throughout the assessment of new nuclear power station designs.
Plug-in solar electrical safety study
UK study testing plug-in solar systems for electrical safety and compatibility with domestic electrical installations to assess suitability and standards compliance.
Water and sewerage companies: EPA methodology for 2026 to 2030
This document outlines the methodology used by the Environment Agency and Natural Resources Wales to conduct annual Environmental Performance Assessments (EPA) of water and sewerage companies operating in England and Wales during the 2026-2030 period.
Radioactive substances regulation (RSR): objective and principles
UK guidance document outlining the fundamental objective of radioactive substances regulation and the 10 regulatory principles applied by the regulator in managing radioactive materials and associated activities.
Proposals for a new standard rules permit for mobile medium combustion plant (MCP) which are boilers
UK consultation seeking views on proposed standard rules permit for mobile medium combustion plant that are boilers, intended to streamline permitting for this equipment category.
Producer responsibility regulations
UK producer responsibility regulations require producers to manage the end-of-life treatment and recycling of packaging, electrical and electronic equipment (EEE), batteries, and end-of-life vehicles (ELVs), establishing environmental and reporting obligations across these product categories.
Legal operator and competence requirements: environmental permits
UK guidance establishing legal, financial, and professional requirements for environmental permit operators and managers, with additional duties specified for waste activity operators.
Standard Assessment Procedure
The Standard Assessment Procedure (SAP) is a UK methodology for calculating residential building energy performance, used to assess how efficiently a home uses energy and to support compliance with building energy standards.
Nature-based solutions for sustainable water resources: Environment Agency position statement
The Environment Agency's position statement outlines nature-based solutions for sustainable water resource management, explaining their mechanisms, environmental benefits, and supporting evidence base for water security and ecological resilience.
Assessing and scoring environmental permit and licence compliance
UK guidance on how the Environment Agency assesses and scores compliance with environmental permits, abstraction licences and impounding licences, establishing the criteria and methodology for evaluating permit holder adherence to regulatory requirements.
Accepting metal shredder residues and post shredder treatment residues at landfills: RPS 314
The Environment Agency clarifies its regulatory position on the acceptance of metal shredder residues (MSR) and post-shredder treatment residues (PSTR) as non-hazardous waste at UK landfills, establishing standards and conditions for disposal.
South West Water pleads guilty to six years of pollutions
South West Water pleads guilty to 18 charges of water pollution affecting Devon and Cornwall over a six-year period. Sentencing is scheduled for 30 July 2026. The case addresses environmental compliance failures in water supply operations.
Get voluntary remediation advice for contaminated land and groundwater
UK guidance enabling voluntary remediation advice for contaminated land and groundwater sites. The service provides detailed site-specific regulatory guidance where land contamination has affected controlled waters, supporting compliance and environmental protection.