مجموعة اللوائح العالمية

تصفح 12,081 لائحة من 36 جهة تنظيمية

2,152 تم تحديثها في آخر 30 يومًا. مجموعة عامة — لا حاجة إلى تسجيل للقراءة.

عرض 3,101–3,150 من أصل 10,084 لائحة

INTIEAUnited Kingdom · Ten Point Plan for a Green Industrial Revolution - Point 6: Jet Zero and Green ShipsPolicyIn force

Ten Point Plan for a Green Industrial Revolution - Point 6: Jet Zero and Green Ships

As part of the Ten Point Plan for a green industrial revolution, point 6 lays out the importance of developing low emissions in air travel. The UK will:   - Invest GBP 15 million into FlyZero, a 12-month study delivered through Aerospace Technology Institute (ATI) in designing…

قبل 12 شهرًانافذ.
INTIEAAustria · Updated National Energy and Climate Plan (NECP)PolicyIn force

Updated National Energy and Climate Plan (NECP)

According to the EU's Regulation on a Governance System for the Energy Union and for Climate Change, Austria's government elaborated an NECP for the periode 2021 to 2030. Relevant targets & contributions and related policies and measures are based on Austria's Climate and Energy…

قبل 12 شهرًانافذ.
INTIEAKuwait · Resolution No.2 of 2015 - The Environmental and Social Impact Assessment System in the State of KuwaitPolicyIn force

Resolution No.2 of 2015 - The Environmental and Social Impact Assessment System in the State of Kuwait

This resolution regulates articles 7 and 16 of the Environmental Protection Law with regards to environmental impact assessments. It describes the purpose of the Environmental and Social Impact Assessment Study (ESIA) and its legal requirements; indicates which projects are…

قبل 12 شهرًانافذ.
INTIEAKuwait · Decision No. 210/2001 pertaining to the Executive By-Law of the Law No. 21/1995 establishing the Environment Public AuthorityPolicyIn force

Decision No. 210/2001 pertaining to the Executive By-Law of the Law No. 21/1995 establishing the Environment Public Authority

The law establishes environmental requirements and standards in Kuwait. These standards apply to aspects related to environmental impacts of development projects, work and indoor environment, chemical resources management, hazardous waste, marine and coastal environment, air…

قبل 12 شهرًانافذ.
INTIEAUzbekistan · Air Pollution ActPolicyIn force

Air Pollution Act

The main objectives of this legislation are the preservation of the natural composition of atmosphere, the prevention and reduction of air pollution, and to provide institutional provisions in the field of atmospheric air protection.   (in Art. 24) It states that organizations…

قبل 12 شهرًانافذ.
INTIEAUzbekistan · Environmental Control Law as AmendedPolicyIn force

Environmental Control Law as Amended

The law regulates relations in the field of environmental control. The main objectives of this legislation are the prevention, detection and suppression of violation of the requirements of legislation in the field of environmental protection and monitoring the state of the…

قبل 12 شهرًانافذ.
INTIEAUzbekistan · Strategy for the Transition to a Green Economy for the 2019-2030 Period - Resolution of the President of the Republic of Uzbekistan No. PP-4477PolicyIn force

Strategy for the Transition to a Green Economy for the 2019-2030 Period - Resolution of the President of the Republic of Uzbekistan No. PP-4477

This resolution outlines a strategy for the transition of the Republic of Uzbekistan to a "green" economy for the period 2019 – 2030 (hereinafter referred to as the Strategy), aiming to improve energy efficiency, rational consumption and conservation of natural resources,…

قبل 12 شهرًانافذ.
INTIEAUzbekistan · Subsoil LawPolicyIn force

Subsoil Law

This law aims to ensure the rational, comprehensive use of subsoil to meet the needs for raw mineral materials, the protection of subsoil, the environment, and work safety. It states that the subsoil is the property of the Republic of Uzbekistan.   Thus, mineral deposits can…

قبل 12 شهرًانافذ.
INTIEACanada · Greenhouse Gas Pollution Pricing ActPolicyIn force

Greenhouse Gas Pollution Pricing Act

This act aims to mitigate climate change through the application of pricing mechanisms to a broad set of greenhouse gas emission sources. It is composed of four main parts: charges related to fuels, pricing of industrial greenhouse gas emissions, the application of provincial…

قبل 12 شهرًانافذ.
INTIEALibya · Decree No. 10/1979 on reorganization of the National Oil CorporationPolicyIn force

Decree No. 10/1979 on reorganization of the National Oil Corporation

Decree No 10/1979 reorganized the National Oil Corporation (NOC), which was established under Law No: 24 of 1970. The Decree tasks the NOC with the enforcement of development plans for areas of petroleum exploration, aiming to support the national economy through the development…

قبل 12 شهرًانافذ.
INTIEAUnited Kingdom · Carbon Capture and Storage (CCS) Infrastructure FundPolicyIn force

Carbon Capture and Storage (CCS) Infrastructure Fund

The Carbon Capture and Storage Infrastructure Fund (CIF) supports the UK government's plan to deploy CCUS in a minimum of two clusters by the mid-2020s, and four clusters by 2030 at the latest, with an ambition to capture 10MtCO₂/year by 2030. The CIF forms an important part of…

قبل 12 شهرًانافذ.
INTIEACanada · (Alberta) AER Directive 60: Upstream Petroleum Industry Flaring, Incinerating, and Venting (downstream provisions)PolicyIn force

(Alberta) AER Directive 60: Upstream Petroleum Industry Flaring, Incinerating, and Venting (downstream provisions)

This entry covers the downstream provisions of Alberta's Directive 60. The upstream measures are covered in a separate entry.    Per section 6, licensees of natural gas transmission pipelines must minimize venting, flaring, and incineration volumes. Licensees must document…

قبل 12 شهرًانافذ.
INTIEAIndonesia · Regulation No.5/2012 on the types of businesses subject to environment impact analysisPolicyIn force

Regulation No.5/2012 on the types of businesses subject to environment impact analysis

Issued by the Ministry of Environment, this regulation outlines the types of businesses and acitivities said to have significant environmental impact and therefore require an environmental impact assessment as per Regulation No.27 and Law No. 32.   Coal bed methane shall have…

قبل 12 شهرًانافذ.
INTIEAIndonesia · Regulation No. 27/2012 Regarding Environmental PermitsPolicyIn force

Regulation No. 27/2012 Regarding Environmental Permits

This regulation implements Environmental Law No. 32, which requires business activities with significant environmental impact to prepare an Analysis of Environmental Impacts (AMDAL) and to obtain an Environmental Permit before beginning business activities.    Ministries or…

قبل 12 شهرًانافذ.
INTIEACanada · (Saskatchewan) Prairie Resilience: Climate Change StrategyPolicyIn force

(Saskatchewan) Prairie Resilience: Climate Change Strategy

In December 2017, the Government of Saskatchewan published a climate change strategy, which identified the oil and gas sector as the largest source of GHG emissions in Saskatchewan. The strategy set a methane reduction target of 40-45% below 2015 levels, while increasing the…

قبل 12 شهرًانافذ.
INTIEANorway · Cold Venting and Fugitive Emissions from Norwegian Offshore Oil and Gas Activities, Modules 1 and 2PolicyIn force

Cold Venting and Fugitive Emissions from Norwegian Offshore Oil and Gas Activities, Modules 1 and 2

The Norwegian Environmental Agency initiated a study (2014-16) to survey methane and NMVOC emission sources at offshore oil and gas installations. All permanent offshore oil and gas facilities on the Norwegian Continental Shelf were surveyed to identify potential emission…

قبل 12 شهرًانافذ.
INTIEAUnited States · Greenhouse Gas Emissions Reporting from the Petroleum and Natural Gas Systems - Background Technical Support DocumentPolicyIn force

Greenhouse Gas Emissions Reporting from the Petroleum and Natural Gas Systems - Background Technical Support Document

This document provides detailed guidance about how to include petroleum and natural gas facilities in an annual emissions reporting under the U.S. national Greenhouse Gas Reporting Rule. The document was initially prepared by the U.S. EPA as it contemplated adding these sources…

قبل 12 شهرًانافذ.
INTIEAMexico · Regulation on the use of associated gasPolicyIn force

Regulation on the use of associated gas

The regulation establishes criteria for how operators must develop a Program for the Use of Associated Natural Gas (AG). This includes defining a goal to achieve 98% use within three years (Art 14) and performing a technical-economic analysis (art 11) to support its achievement.…

قبل 12 شهرًانافذ.
INTIEACanada · (Alberta) AER Directive 062: Coalbed Methane Control Well Requirements and Related MattersPolicyIn force

(Alberta) AER Directive 062: Coalbed Methane Control Well Requirements and Related Matters

This directive details requirements and issues specific to the control well process and supersedes any previous AER publication on coalbed methane control well requirements. A control well is established for the purpose of collecting pressure, productivity, and gas content…

قبل 12 شهرًانافذ.
INTIEACanada · (Alberta) AER Directive 034: Gas Well Testing, Theory and PracticePolicyIn force

(Alberta) AER Directive 034: Gas Well Testing, Theory and Practice

This directive discusses the principles and practice of gas well testing to analyze the performance and forecast the productivity of gas wells and to understand the behaviour of gas reservoirs. Aspects of gas well testing discussed in this directive include theoretical…

قبل 12 شهرًانافذ.
INTIEACanada · (Alberta) AER Directive 033: Well Servicing and Completions Operations – Interim Requirement Regarding the Potential for Explosive Mixtures and Ignition in WellsPolicyIn force

(Alberta) AER Directive 033: Well Servicing and Completions Operations – Interim Requirement Regarding the Potential for Explosive Mixtures and Ignition in Wells

Licensees must have documented practices available at the well site for the safe management of the potential for explosive mixtures and ignition in wells and associated surface equipment, and ensure that all well site staff responsible for well control and blowout prevention,…

قبل 12 شهرًانافذ.
INTIEACanada · (Alberta) Code of Practice for Exploration OperationsPolicyIn force

(Alberta) Code of Practice for Exploration Operations

Outlines that no person shall commence or continue conduct or reclamation of any exploration operation unless an activities plan has been: (a) prepared; and (b) maintained current. Schedule 2 comprehensively describes the contents of the activities plan to be submitted.…

قبل 12 شهرًانافذ.
INTIEACanada · (Alberta) Emissions Trading RegulationPolicyIn force

(Alberta) Emissions Trading Regulation

Outlines the baseline emissions rate for for a natural gas-fired generating unit that has (i) a maximum continuous rating of 20 megawatts or less, the baseline emission rate for NOX is 0.5 kg/MWh; (ii) a maximum continuous rating of more than 20 megawatts but not more than 60…

قبل 12 شهرًانافذ.
INTIEACanada · (Alberta) Gas Resources Preservation RegulationPolicyIn force

(Alberta) Gas Resources Preservation Regulation

Outlines the conditions of permits to be: all gas to be removed from Alberta pursuant to the permit shall be measured by or on behalf of the permittee by meters approved by the Board; (b) the relative density, higher heating value and volume of all gas received by the permittee…

قبل 12 شهرًانافذ.
INTIEACanada · (Alberta) Gas Resources Preservation Act 2000PolicyIn force

(Alberta) Gas Resources Preservation Act 2000

Without limiting the generality of section 4, the terms and conditions prescribed by the Regulator may include all or any of the following: (a) the point at which the permittee may remove gas or propane from Alberta;  (b) the maximum annual quantities of gas or propane that may…

قبل 12 شهرًانافذ.
INTIEACanada · (British Columbia) Oil and Gas Activities ActPolicyIn force

(British Columbia) Oil and Gas Activities Act

Establishes the BC Oil and Gas Commission and governs oil and gas activity permits. Outlines the obligations of a permit holder with respect to environmental regulations passed by the Commission.   Governed by Ministry of Environment and Climate Change Strategy and BC Oil and…

قبل 12 شهرًانافذ.
INTIEACanada · (British Columbia) Carbon Tax RegulationPolicyIn force

(British Columbia) Carbon Tax Regulation

Governs the administration of the carbon tax within British Columbia.    While BC's carbon tax does not apply to methane, BC may approve reductions reductions from non-regulated activities to count as offsets for the carbon tax.  Thus, it is possible that reductions from…

قبل 12 شهرًانافذ.
INTIEAAustralia · (South Australia) Dangerous Substances (General) Regulations 2017PolicyIn force

(South Australia) Dangerous Substances (General) Regulations 2017

Outlines that the work and operation involved in gas fitting must meet certain safety standards in the AS/NZS 2739 guide. This is an indirect means of targetting emissions as the standards require fitters to ensure leakage is kept as low as reasonably practicable (ALARP).…

قبل 12 شهرًانافذ.
INTIEAAustralia · (South Australia) Environment Protection Act 1993PolicyIn force

(South Australia) Environment Protection Act 1993

Establishes a general duty that a person must not undertake an activity that pollutes, or might pollute, the environment unless the person takes all reasonable and practicable measures to prevent or minimise any resulting environmental harm. Outlines that an activity that…

قبل 12 شهرًانافذ.
INTIEAAustralia · Environment Protection and Biodiversity Conservation Act 1999PolicyIn force

Environment Protection and Biodiversity Conservation Act 1999

The Act provides a basis for the Minister to decide whether an action that has, will have or is likely to have a significant impact on certain aspects of the environment should proceed. It does so by prohibiting a person from taking an action without the Minister having given…

قبل 12 شهرًانافذ.
INTIEAAustralia · (Tasmania) Petroleum (Submerged Lands) Act 1982PolicyIn force

(Tasmania) Petroleum (Submerged Lands) Act 1982

Governs the licensing and permit requirements for petroleum exploration, mining and extraction. It also dictates that in the instance that wells are flared or vented, no royalty is able to be paid on such emissions that were flared or vented in Tasmanian waters. Additionally…

قبل 12 شهرًانافذ.
INTIEAAustralia · Offshore Petroleum and Greenhouse Gas Storage (Environment) Regulations 2009PolicyIn force

Offshore Petroleum and Greenhouse Gas Storage (Environment) Regulations 2009

The object of these Regulations is to ensure that any petroleum activity or greenhouse gas storage activity carried out in an offshore area is:                   (a)    carried out in a manner consistent with the principles of ecologically sustainable development; and…

قبل 12 شهرًانافذ.
INTIEAAustralia · Offshore Petroleum and Greenhouse Gas Storage (Safety) Regulations 2009PolicyIn force

Offshore Petroleum and Greenhouse Gas Storage (Safety) Regulations 2009

Established to ensure that the risks to the health and safety of persons at facilities are reduced to a level that is as low as reasonably practicable and to ensure that facilities are designed, constructed, installed, operated, modified and decommissioned in Commonwealth waters…

قبل 12 شهرًانافذ.
INTIEAPeru · Minimum Energy Performance Standards GuidePolicyIn force

Minimum Energy Performance Standards Guide

Within the framework of Law No. 27345, the Law for the Promotion of the Efficient Use of Energy (enacted on September 8, 2000), and its regulations, approved by Supreme Decree No. 053-2007-EM (issued on October 23, 2007), the Ministry of Energy and Mines has established minimum…

قبل 12 شهرًانافذ.
INTIEAItaly · Decree for energy efficiency requirements in buildingsPolicyIn force

Decree for energy efficiency requirements in buildings

The Decree-Law of June 4, 2013, n. 63, aims to improve the energy performance of buildings in Italy by transposing Directive 2010/31/EU. It addresses the urgent need to comply with European Union regulations and avoid infringement procedures. The decree promotes energy…

قبل 12 شهرًانافذ.
INTIEACanada · EnerGuide Home Labelling PortalPolicyIn force

EnerGuide Home Labelling Portal

The EnerGuide Home Labelling Portal is a site that allows homeowners who have had an EnerGuide home evaluation to access their score online, review related recommended upgrades, and share their home energy performance data with others. The site provides homeowners with a quick…

قبل 12 شهرًانافذ.
INTIEABangladesh · Bangladesh National Building CodePolicyIn force

Bangladesh National Building Code

The Bangladesh National Building Code ( BNBC ) was first published in 1993 to regulate the construction of buildings. The code was updated in 2020. Chapter 4 (Energy Efficiency and Sustainability) seeks to ensure energy efficiency through passive and low energy architectural…

قبل 12 شهرًانافذ.
INTIEAUnited States · EV EverywherePolicyIn force

EV Everywhere

EV Everywhere is the umbrella effort of the U.S. Department of Energy to increase the adoption and use of plug-in electric vehicles. EV Everywhere was launched in 2012 as an ambitious, far-reaching, national goal to help the U.S. become more energy secure and environmentally…

قبل 12 شهرًانافذ.
INTIEAUnited States · H2usaPolicyIn force

H2usa

H2USA is a public-private partnership to promote the commercial introduction and widespread adoption of hydrogen fueled fuel cell electric vehicles across America. H2USA’s mission is to address hurdles to establishing hydrogen fueling infrastructure, enabling the large scale…

قبل 12 شهرًانافذ.
INTIEABangladesh · Scaling Up Renewable Energy Program for Bangladesh (SREP Bangladesh)PolicyIn force

Scaling Up Renewable Energy Program for Bangladesh (SREP Bangladesh)

Scaling Up Renewable Energy Program for Bangladesh (SREP Bangladesh) was released at the end of 2015 to outline potential development and investments in the renewable energy sector in the country. The Investment Plan of SREP, if implemented, will be transformational for…

قبل 12 شهرًانافذ.
INTIEAAngola · Energy 2025 - Electrification of Rural AreasPolicyIn force

Energy 2025 - Electrification of Rural Areas

The Rural Electrification program’s objective is part of the Long-term vision “Angola 2025” to achieve a rural electrification rate of

قبل 12 شهرًانافذ.
INTIEAUnited States · Carbon Sequestration Regional PartnershipsPolicyIn force

Carbon Sequestration Regional Partnerships

Regional Carbon Sequestration Partnerships (RCSPs) help develop the technology, infrastructure, and regulations to implement large-scale CO2 sequestration in different regions and geologic formations in the US. Local organizations and citizens contribute expertise, experience,…

قبل 12 شهرًانافذ.
INTIEAUnited States · Geologic Sequestration Training and ResearchPolicyIn force

Geologic Sequestration Training and Research

The Geologic Sequestration Training and Research is a grant program that funds projects offering training opportunities for graduate and undergraduate students that will provide the human capital and skills required for implementing and deploying carbon capture and storage…

قبل 12 شهرًانافذ.
INTIEAUnited States · Nuclear Power Generation IV International ForumPolicyIn force

Nuclear Power Generation IV International Forum

The Generation IV International Forum (GIF) is a co-operative international endeavor organised to carry out the research and development (R & D) needed to establish the feasibility and performance capabilities of the next generation nuclear energy systems. The Generation IV…

قبل 12 شهرًانافذ.
INTIEAUnited States · International Partnership for Hydrogen and Fuel Cells in the Economy (IPHE)PolicyIn force

International Partnership for Hydrogen and Fuel Cells in the Economy (IPHE)

Originally organized in 2003 as "The International Partnership for the Hydrogen Economy," this organization changed its official title to "The International Partnership for Hydrogen and Fuel Cells in the Economy" in December 2009. The Partnership (or IPHE) fosters international…

قبل 12 شهرًانافذ.
INTIEAUnited Kingdom · Plug-in vehicle grantsPolicyIn force

Plug-in vehicle grants

In February 2025, the plug-in van grant was extended into the 2025/26 financial year with £120m in government funding to support the switch to cleaner vans, wheelchair accessible vehicles and taxis. The maximum grant for small vans is £2,500 and for large vans £5,000.     The…

قبل 12 شهرًانافذ.
INTIEAColombia · Law 697 on the promotion of the efficient and rational use of energy and alternative energiesPolicyIn force

Law 697 on the promotion of the efficient and rational use of energy and alternative energies

This law declared the Rational and Efficient Use of Energy a matter of social, public and national interest, fundamental to ensure the full and timely energy supply, the competitiveness of the Colombian economy and consumer protection. It promotes the sustainable use of…

قبل 12 شهرًانافذ.
INTIEACzech Republic · Act No. 44/1988 Coll. on the protection and utilization of mineral resourcesPolicyIn force

Act No. 44/1988 Coll. on the protection and utilization of mineral resources

The Act sets the policy framework for the exploitation and protection of minerals in Czechia, including coal, crude oil and flammable natural gas. Extraction requires the obtention of a permit from the District Mining

قبل 12 شهرًانافذ.
INTIEAGermany · Support to electric vehicle procurement and charging infrastructure developmentPolicyIn force

Support to electric vehicle procurement and charging infrastructure development

The Federal Ministry for Digital and Transport Affairs (BMDV) is investing in the procurement of vehicles and the development of charging infrastructure as part of the electric mobility funding guideline via funding calls. The funding supports municipal and commercial fleets in…

قبل 12 شهرًانافذ.
INTIEAGermany · Heat Planning ActPolicyIn force

Heat Planning Act

The Heat Planning Act requires local competent authorities to develop a plan to decarbonise the heat supply by 2045. The deadline to submit the first plan is June 2026 for large municipalities and June 2028 for smaller municipalities.  It is supposed to be updated every five…

قبل 12 شهرًانافذ.